KERN CONSTRUCTION & ELECTRIC INC

How many solar installs has KERN CONSTRUCTION & ELECTRIC INC done in California, and which license number is on its installs?

KERN CONSTRUCTION & ELECTRIC INC has 77 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Nov 21, 2016 to Apr 14, 2026), most of them in Kern County (68), San Diego County (2) and Santa Clara County (2). CSLB lists license 732856 (KERN CONSTRUCTION & ELECTRIC INC) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
77
Last 24 months
6
Total capacity
641 kW DC
Median system size
7.8 kW DC
With battery storage
4.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
6.5% of 77 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest May 10, 2024
Ownership types recorded
PPA 5
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Nov 21, 2016
Latest install
Apr 14, 2026
Counties
7
Utilities
PGE 68, SCE 7, SDGE 2
CSLB license
732856

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
201700
201810
201931
202040
202130
2022240
2023331
202451
202520
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 77 interconnected installs (5.2% of the 77 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved May 10, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.3%not counted
NEM 2.07293.5%1 (1.4%)
Net Billing Tariff45.2%2 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 5 of KERN CONSTRUCTION & ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 5, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches KERN CONSTRUCTION & ELECTRIC INC exactly.

Third-party owner named on its installsInstalls
Everbright Financial5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of KERN CONSTRUCTION & ELECTRIC INC’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used modules recorded as United Renewable Energy.

In the last 24 months, 6 of KERN CONSTRUCTION & ELECTRIC INC’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of KERN CONSTRUCTION & ELECTRIC INC’s 6 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy324
Qcells130
Inverter makerEnphase667
Power-One11
SMA11
Battery makerEnphase02
LG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 75 of 77 installs, inverters on 77. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
732856KERN CONSTRUCTION & ELECTRIC INC (Corporation)Contr Bond SuspB General Building Contractor; C-10 Electrical ContractorFeb 26, 1997Mar 31, 202777

License numbers are the ones the utilities recorded on the interconnection applications (77 of 77 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 732856. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern68
San Diego2
Santa Clara2
Tulare2
Los Angeles1
Monterey1
San Bernardino1

Top cities

CityInstalls
Bakersfield60
Arvin2
Delano2
San Diego2
Wasco2
Alta Loma1
Lindsay1
Los Angeles1
Milpitas1
Salinas1
San Jose1
Shafter1
Tehachapi1
Tulare1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KERN CONSTRUCTION & ELECTRIC INC71
Kern Construction & Electric Inc.3
Kern Construction and Electric Inc2
Kern Construction & Electric1

Common questions

Where does KERN CONSTRUCTION & ELECTRIC INC install solar?

Its installs are spread across 7 counties. The most are in Kern County (68 installs), followed by San Diego County (2).

How often does KERN CONSTRUCTION & ELECTRIC INC install batteries with solar?

4.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 6). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many KERN CONSTRUCTION & ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 77 interconnected installs (5.2% of the 77 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.