MAC GREINE ENERGY CORP

How many solar installs has MAC GREINE ENERGY CORP done in California, and which license number is on its installs?

MAC GREINE ENERGY CORP has 67 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Aug 19, 2019 to Aug 24, 2026), most of them in Los Angeles County (64), Orange County (1) and San Bernardino County (1). CSLB lists license 1000366 (MAC GREINE ENERGY CORP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-39, C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
67
Last 24 months
38
Total capacity
415.8 kW DC
Median system size
5.1 kW DC
With battery storage
14.9% all time; 10.5% last 24 months
Third-party owned
0.0% of 67 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
45 installs, latest Aug 24, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (10 installs list a capacity)
First install
Aug 19, 2019
Latest install
Aug 24, 2026
Counties
4
Utilities
SCE 67
CSLB license
1000366

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201920
202030
202150
202220
202382
2024124
2025151
2026 (through Aug 31, 2026)203

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

45 of its 67 interconnected installs (67.2% of the 67 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 17.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02232.8%2 (9.1%)
Net Billing Tariff4567.2%8 (17.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on MAC GREINE ENERGY CORP’s installs. No residential system in the file lists a third-party owner name that matches MAC GREINE ENERGY CORP exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 38 of MAC GREINE ENERGY CORP’s 38 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 39.5%) used modules recorded as Qcells.

In the last 24 months, 38 of MAC GREINE ENERGY CORP’s 38 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (37, 97.4%) used inverters recorded as Enphase.

In the last 24 months, 4 of MAC GREINE ENERGY CORP’s 38 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used batteries recorded as Enphase.

9 of 10 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1534
Hyundai1111
Canadian Solar917
Znshine22
Hanwa Q-Cell12
Inverter makerEnphase3755
SMA14
Battery makerEnphase49

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 67 of 67 installs, inverters on 67. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1000366MAC GREINE ENERGY CORP (Corporation)CLEARC-39 Roofing Contractor; C-46 Solar ContractorJan 20, 2015Jan 31, 202767

License numbers are the ones the utilities recorded on the interconnection applications (67 of 67 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1000366. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles64
Orange1
San Bernardino1
Ventura1

Top cities

CityInstalls
Redondo Beach32
Rancho Palos Verdes5
Manhattan Beach4
Culver City3
Palos Verdes Estates3
Torrance3
Gardena2
Lawndale2
Altadena1
Beverly Hills1
Cerritos1
El Monte1
La Mirada1
Lake Forest1
Loma Linda1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MAC GREINE ENERGY CORP67

Common questions

Where does MAC GREINE ENERGY CORP install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (64 installs), followed by Orange County (1).

How often does MAC GREINE ENERGY CORP install batteries with solar?

14.9% of its interconnected solar installs include battery storage across all years, and 10.5% in the last 24 months (4 of 38).

How many MAC GREINE ENERGY CORP installs are under NEM 3.0 (the Net Billing Tariff)?

45 of its 67 interconnected installs (67.2% of the 67 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 17.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.