Magnolia Construction Inc.

How many solar installs has Magnolia Construction Inc. done in California, and which license number is on its installs?

Magnolia Construction Inc. has 34 residential solar installs interconnected in California, active in the records from 2017 through 2018 (Jul 19, 2017 to Jun 14, 2018), most of them in Alameda County (5), Kern County (4) and Fresno County (3). The license number recorded on most of its installs, 1021854, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
0
Total capacity
139.1 kW DC
Median system size
3.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 19, 2017
Latest install
Jun 14, 2018
Counties
16
Utilities
PGE 30, SCE 4
CSLB license
1021854

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017180
2018160
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0617.6%not counted
NEM 2.02882.4%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Magnolia Construction Inc.’s installs. No residential system in the file lists a third-party owner name that matches Magnolia Construction Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 33 of Magnolia Construction Inc.’s 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (20, 60.6%) used modules recorded as Silfab.

Across all years, 34 of Magnolia Construction Inc.’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (28, 82.4%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab020
JinkoSolar08
Canadian Solar05
Inverter makerSolarEdge028
Enphase03
Fronius03
Kaco01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 33 of 34 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1021854Not found in the CSLB License Master file pulled Nov 4, 202634

License numbers are the ones the utilities recorded on the interconnection applications (34 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Alameda5
Kern4
Fresno3
Sonoma3
Stanislaus3
Contra Costa2
Los Angeles2
Merced2
San Joaquin2
Solano2
Glenn1
Kings1
Lake1
Mendocino1
Mono1
Yolo1

Top cities

CityInstalls
Newman3
Oakland3
Bakersfield2
Fairfield2
Fresno2
Livingston2
Antioch1
Bell Gardens1
Chalfant Valley1
Cloverdale1
Hanford1
Kelseyville1
Manteca1
Newark1
Palmdale1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Magnolia Construction Inc.28
MAGNOLIA CONSTRUCTION INC3
Magnolia Construction Inc2
Magnolia Construction1

Common questions

Where does Magnolia Construction Inc. install solar?

Its installs are spread across 16 counties. The most are in Alameda County (5 installs), followed by Kern County (4).

How often does Magnolia Construction Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Magnolia Construction Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.