MARAVILLA CONSTRUCTION

How many solar installs has MARAVILLA CONSTRUCTION done in California, and which license number is on its installs?

MARAVILLA CONSTRUCTION has 52 residential solar installs interconnected in California, active in the records from 2022 through 2024 (Mar 30, 2022 to Nov 15, 2024), most of them in San Bernardino County (21), Los Angeles County (13) and Riverside County (12). The license number recorded on most of its installs, 1056065, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
52
Last 24 months
1
Total capacity
442.6 kW DC
Median system size
8 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
19.2% of 52 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Mar 25, 2024
Ownership types recorded
PPA 1, lease 1, other 8
First install
Mar 30, 2022
Latest install
Nov 15, 2024
Counties
4
Utilities
SCE 52
CSLB license
1056065

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022260
2023230
202430
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 52 interconnected installs (1.9% of the 52 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 25, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05198.1%0 (0.0%)
Net Billing Tariff11.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 10 of MARAVILLA CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 1, lease 1, prepaid lease 0, other 8. Across all installers, 1 residential systems list a third-party owner name that matches MARAVILLA CONSTRUCTION exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova Energy8
Infinity Energy1
MARAVILLA CONSTRUCTION1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of MARAVILLA CONSTRUCTION’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.

In the last 24 months, 1 of MARAVILLA CONSTRUCTION’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells133
Inverter makerEnphase119

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 40 of 52 installs, inverters on 52. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1056065Not found in the CSLB License Master file pulled Nov 4, 202652

License numbers are the ones the utilities recorded on the interconnection applications (52 of 52 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Bernardino21
Los Angeles13
Riverside12
Orange6

Top cities

CityInstalls
San Bernardino11
Perris4
Santa Ana3
Baldwin Park2
Chino2
Covina2
El Monte2
Fontana2
Garden Grove2
Moreno Valley2
Rialto2
Artesia1
Bell Gardens1
Flintridge1
Hemet1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MARAVILLA CONSTRUCTION52

Common questions

Where does MARAVILLA CONSTRUCTION install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (21 installs), followed by Los Angeles County (13).

How often does MARAVILLA CONSTRUCTION install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many MARAVILLA CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 52 interconnected installs (1.9% of the 52 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.