MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS

How many solar installs has MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS done in California, and which license number is on its installs?

MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS has 36 residential solar installs interconnected in California, active in the records from 2022 through 2025 (Sep 20, 2022 to Sep 10, 2025), most of them in Orange County (29) and Los Angeles County (7). CSLB lists license 643700 (MCCORMACK ROOFING & SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
36
Last 24 months
3
Total capacity
330.2 kW DC
Median system size
7.8 kW DC
With battery storage
5.6% all time; 0.0% last 24 months
Third-party owned
0.0% of 36 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest May 31, 2024
Ownership types recorded
none recorded
Median battery size
11.8 kWh (2 installs list a capacity)
First install
Sep 20, 2022
Latest install
Sep 10, 2025
Counties
2
Utilities
SCE 36
CSLB license
643700

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202270
2023151
2024131
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 36 interconnected installs (2.8% of the 36 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved May 31, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03597.2%1 (2.9%)
Net Billing Tariff12.8%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS’s installs. No residential system in the file lists a third-party owner name that matches MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS’ 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Tesla.

In the last 24 months, 3 of MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS’ 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1, 33.3%) used inverters recorded as Enphase.

In the last 24 months, none of MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS’ 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTesla23
United Renewable Energy123
Inverter makerEnphase110
SolarEdge114
Tesla15
Battery makerEnphase01
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 36 of 36 installs, inverters on 36. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
643700MCCORMACK ROOFING & SOLAR INC (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorApr 30, 1992Jun 30, 202836

License numbers are the ones the utilities recorded on the interconnection applications (36 of 36 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 643700. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Orange29
Los Angeles7

Top cities

CityInstalls
Lake Forest6
Irvine3
Newport Beach3
Aliso Viejo2
Mission Viejo2
Orange2
Santa Ana2
Whittier2
Brea1
Cerritos1
Costa Mesa1
Coto de Caza1
Huntington Beach1
Laguna Hills1
Long Beach1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS36

Common questions

Where does MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS install solar?

Its installs are spread across 2 counties. The most are in Orange County (29 installs), followed by Los Angeles County (7).

How often does MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS install batteries with solar?

5.6% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 3).

How many MC CORMACK ROOFING CONSTRUCTION & ENERGY SOLUTIONS installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 36 interconnected installs (2.8% of the 36 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.