NexGen Construction

How many solar installs has NexGen Construction done in California, and which license number is on its installs?

NexGen Construction has 41 residential solar installs interconnected in California, active in the records from 2014 through 2017 (Jan 28, 2014 to Jun 13, 2017), most of them in Orange County (24), Los Angeles County (16) and Riverside County (1). CSLB lists license 933867 (NEXGEN CONSTRUCTION SERVICES INC) with status Work Comp Susp in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
41
Last 24 months
0
Total capacity
228.5 kW DC
Median system size
5.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 22 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jan 28, 2014
Latest install
Jun 13, 2017
Counties
3
Utilities
SCE 41
CSLB license
933867

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014160
2015160
201670
201720
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.041100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on NexGen Construction’s installs. No residential system in the file lists a third-party owner name that matches NexGen Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 20 of NexGen Construction’s 41 installs name a module maker in the “Generator Manufacturer” fields, and most of those (16, 80.0%) used modules recorded as Suniva.

Across all years, 41 of NexGen Construction’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (40, 97.6%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSuniva016
LG02
China Sunergy (Nanjing)01
Hyundai01
Inverter makerEnphase040
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 20 of 41 installs, inverters on 41. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
933867NEXGEN CONSTRUCTION SERVICES INC (Corporation)Work Comp SuspB General Building Contractor; C-10 Electrical ContractorJun 12, 2009Jun 30, 202740

License numbers are the ones the utilities recorded on the interconnection applications (41 of 41 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 933867. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Orange24
Los Angeles16
Riverside1

Top cities

CityInstalls
Long Beach11
Los Alamitos6
Huntington Beach4
Seal Beach4
Cypress2
Placentia2
Yorba Linda2
Artesia1
Buena Park1
Corona del Mar1
Fullerton1
Harbor City1
La Habra Heights1
Lakewood1
Orange1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NexGen Construction21
NEXGEN CONSTRUCTION20

Common questions

Where does NexGen Construction install solar?

Its installs are spread across 3 counties. The most are in Orange County (24 installs), followed by Los Angeles County (16).

How often does NexGen Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many NexGen Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.