Njoord Incorporated DBA Newport Power

How many solar installs has Njoord Incorporated DBA Newport Power done in California, and which license number is on its installs?

Njoord Incorporated DBA Newport Power has 34 residential solar installs interconnected in California, active in the records from 2011 through 2024 (Feb 7, 2011 to Dec 17, 2024), most of them in Los Angeles County (13), Orange County (10) and San Bernardino County (10). CSLB lists license 939960 (NEWPORT POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
9
Total capacity
238.2 kW DC
Median system size
5.5 kW DC
With battery storage
8.8% all time; 11.1% last 24 months
Third-party owned
29.4% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Dec 17, 2024
Ownership types recorded
other 10
Median battery size
10.1 kWh (3 installs list a capacity)
First install
Feb 7, 2011
Latest install
Dec 17, 2024
Counties
4
Utilities
SCE 34
CSLB license
939960

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
201200
201340
201420
201500
201600
201700
201810
201930
202030
202121
202231
202340
2024101
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 34 interconnected installs (29.4% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 10.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 17, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0823.5%not counted
NEM 2.01647.1%2 (12.5%)
Net Billing Tariff1029.4%1 (10.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 10 of Njoord Incorporated DBA Newport Power’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 10. No residential system in the file lists a third-party owner name that matches Njoord Incorporated DBA Newport Power exactly.

Third-party owner named on its installsInstalls
PearlX VPP Holdings, LLC8
Klaetsch, Jeffery1
PearlX Infrastructure LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of Njoord Incorporated DBA Newport Power’s 9 installs name a module maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used modules recorded as Canadian Solar.

In the last 24 months, 9 of Njoord Incorporated DBA Newport Power’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 88.9%) used inverters recorded as Enphase.

In the last 24 months, 1 of Njoord Incorporated DBA Newport Power’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as SolarEdge.

2 of 3 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar99
Inverter makerEnphase826
SolarEdge17
Battery makerSolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 26 of 34 installs, inverters on 34. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Njoord Incorporated DBA Newport Power as developer on 3 battery storage projects and as installer on 3 (2 name it as both), 4 projects in all with 2,640 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from May 12, 2020 to Sep 19, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
PBI in Process1669$562,393
Reserved11,606$1,365,100
Cancelled2365$237,792

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Non-Residential Storage Equity32,627$2,140,0850$0
Equity Resiliency113$25,2000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
939960NEWPORT POWER (Corporation)CLEARA General Engineering Contractor; C-10 Electrical ContractorNov 9, 2009Nov 30, 202734

License numbers are the ones the utilities recorded on the interconnection applications (34 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 939960. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Njoord Incorporated DBA Newport Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202220232024Total
unincorporated San Diego County939960111227

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles13
Orange10
San Bernardino10
Riverside1

Top cities

CityInstalls
Victorville9
La Canada Flintridge4
Orange4
Brea2
Diamond Bar2
Altadena1
Beverly Hills1
Claremont1
Hermosa Beach1
Huntington Beach1
La Canada1
Lawndale1
Manhattan Beach1
Murrieta1
Redlands1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NJOORD INCORPORATED DBA NEWPORT POWER17
NJOORD INCORPORATED9
Njoord Incorporated DBA Newport Power8

Common questions

Where does Njoord Incorporated DBA Newport Power install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (13 installs), followed by Orange County (10).

How often does Njoord Incorporated DBA Newport Power install batteries with solar?

8.8% of its interconnected solar installs include battery storage across all years, and 11.1% in the last 24 months (1 of 9).

How many Njoord Incorporated DBA Newport Power installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 34 interconnected installs (29.4% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 10.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.