ONESUN LLC

How many solar installs has ONESUN LLC done in California, and which license number is on its installs?

ONESUN LLC has 43 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jan 11, 2023 to Mar 24, 2026), most of them in Los Angeles County (36), Orange County (3) and Ventura County (3). CSLB lists license 1096220 (ONESUN LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
43
Last 24 months
15
Total capacity
347.1 kW DC
Median system size
7.6 kW DC
With battery storage
37.2% all time; 93.3% last 24 months
Third-party owned
0.0% of 43 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17 installs, latest Mar 24, 2026
Ownership types recorded
none recorded
Median battery size
11.8 kWh (16 installs list a capacity)
First install
Jan 11, 2023
Latest install
Mar 24, 2026
Counties
4
Utilities
SCE 43
CSLB license
1096220

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023220
202472
20251212
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17 of its 43 interconnected installs (39.5% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.1% of those include battery storage. The latest Net Billing Tariff install was approved Mar 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02660.5%0 (0.0%)
Net Billing Tariff1739.5%16 (94.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ONESUN LLC’s installs. No residential system in the file lists a third-party owner name that matches ONESUN LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of ONESUN LLC’s 15 installs name a module maker in the “Generator Manufacturer” fields, and most of those (12, 80.0%) used modules recorded as REC.

In the last 24 months, 15 of ONESUN LLC’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 14 of ONESUN LLC’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 64.3%) used batteries recorded as Enphase.

16 of 16 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1238
Hyundai23
JA Solar11
Inverter makerEnphase1030
Tesla55
Battery makerEnphase911
Tesla55

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 43 installs, inverters on 43. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ONESUN LLC as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 43 kWh of storage. 3 have the status Paid, with $4,997 in current incentive allocations. Applications were received from Oct 24, 2024 to Sep 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid333$4,997
Pending Reservation110$30,474

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage333$4,9973$4,997
Residential Solar and Storage Equity - AB 209110$30,4740$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1096220ONESUN LLC (Limited Liability)CLEARC-46 Solar ContractorSep 7, 2022Sep 30, 202843

License numbers are the ones the utilities recorded on the interconnection applications (43 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1096220. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles36
Orange3
Ventura3
San Bernardino1

Top cities

CityInstalls
South Pasadena6
Agoura Hills3
Chatsworth3
La Canada2
La Crescenta2
Palmdale2
Simi Valley2
Torrance2
Acton1
Altadena1
Buena Park1
Chino Hills1
Culver City1
Diamond Bar1
Downey1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ONESUN LLC43

Common questions

Where does ONESUN LLC install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (36 installs), followed by Orange County (3).

How often does ONESUN LLC install batteries with solar?

37.2% of its interconnected solar installs include battery storage across all years, and 93.3% in the last 24 months (14 of 15).

How many ONESUN LLC installs are under NEM 3.0 (the Net Billing Tariff)?

17 of its 43 interconnected installs (39.5% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.