Open Energy

How many solar installs has Open Energy done in California, and which license number is on its installs?

Open Energy has 84 residential solar installs interconnected in California, active in the records from 2007 through 2011 (Oct 31, 2007 to Apr 6, 2011), most of them in El Dorado County (37), San Diego County (23) and San Bernardino County (6). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
84
Last 24 months
0
Total capacity
191.3 kW DC
Median system size
2.1 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Oct 31, 2007
Latest install
Apr 6, 2011
Counties
12
Utilities
PGE 54, SDGE 23, SCE 7
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
2007130
2008530
2009110
201050
201120
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 84 interconnected installs with a tariff recorded (84) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.084100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Open Energy’s installs. No residential system in the file lists a third-party owner name that matches Open Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 54 of Open Energy’s 84 installs name a module maker in the “Generator Manufacturer” fields, and most of those (53, 98.1%) used modules recorded as Open Energy Corporation.

Across all years, 84 of Open Energy’s 84 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 56.0%) used inverters recorded as PV Powered.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerOpen Energy Corporation053
Connect Renewable Energy01
Inverter makerPV Powered047
Connect Renewable Energy021
Open Energy Corporation010
Advanced Energy, Inc.05
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 84 installs, inverters on 84. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 84 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
El Dorado37
San Diego23
San Bernardino6
Yolo6
Placer4
Alameda2
Fresno1
Kern1
Kings1
San Joaquin1
Tulare1
Yuba1

Top cities

CityInstalls
El Dorado Hills37
San Diego23
Woodland6
Fontana5
Granite Bay2
Castro Valley1
Chino Hills1
Fresno1
Lathrop1
Lemoore1
Loomis1
Marysville1
Pleasanton1
Rocklin1
Taft1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Open Energy41
Open Energy Corporation31
OPEN ENERGY CORPORATION7
Open Energy Corp.3
Open Energy Corp1
Open Energy, Inc.1

Common questions

Where does Open Energy install solar?

Its installs are spread across 12 counties. The most are in El Dorado County (37 installs), followed by San Diego County (23).

How often does Open Energy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Open Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 84 interconnected installs with a tariff recorded (84) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.