P B C DEVELOPMENT INC has 56 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Mar 25, 2019 to Apr 16, 2026), most of them in Orange County (42), Riverside County (8) and Los Angeles County (4). CSLB lists license 806350 (P B C DEVELOPMENT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
56
Last 24 months
3
Total capacity
544.2 kW DC
Median system size
8.7 kW DC
With battery storage
5.4% all time; 33.3% last 24 months
Third-party owned
0.0% of 56 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Aug 13, 2024
Ownership types recorded
none recorded
Median battery size
13.6 kWh (3 installs list a capacity)
First install
Mar 25, 2019
Latest install
Apr 16, 2026
Counties
5
Utilities
SCE 56
CSLB license
806350

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201950
202080
2021110
202290
2023121
202491
202510
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 56 interconnected installs (1.8% of the 56 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 13, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05598.2%2 (3.6%)
Net Billing Tariff11.8%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on P B C DEVELOPMENT INC’s installs. No residential system in the file lists a third-party owner name that matches P B C DEVELOPMENT INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of P B C DEVELOPMENT INC’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as REC.

In the last 24 months, 3 of P B C DEVELOPMENT INC’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1, 33.3%) used inverters recorded as Chilicon Power, LLC.

In the last 24 months, 1 of P B C DEVELOPMENT INC’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as FranklinWH.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC240
Chilicon Power, LLC11
Solivia1not in top list
Inverter makerChilicon Power, LLC14
Enphase120
Hoymiles1not in top list
Solivia1not in top list
Battery makerFranklinWH12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 56 installs, inverters on 56. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
806350P B C DEVELOPMENT INC (Corporation)CLEARB General Building ContractorApr 5, 2002Apr 30, 202856

License numbers are the ones the utilities recorded on the interconnection applications (56 of 56 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 806350. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list P B C DEVELOPMENT INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated San Diego County80635011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange42
Riverside8
Los Angeles4
Kern1
Tulare1

Top cities

CityInstalls
Mission Viejo7
Laguna Beach6
Irvine4
Newport Beach3
Orange3
Fountain Valley2
Huntington Beach2
Lake Forest2
Norco2
Santa Ana2
Trabuco Canyon2
Yorba Linda2
Brea1
Cathedral City1
Cerritos1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
P B C DEVELOPMENT INC56

Common questions

Where does P B C DEVELOPMENT INC install solar?

Its installs are spread across 5 counties. The most are in Orange County (42 installs), followed by Riverside County (8).

How often does P B C DEVELOPMENT INC install batteries with solar?

5.4% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (1 of 3).

How many P B C DEVELOPMENT INC installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 56 interconnected installs (1.8% of the 56 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.