PermaCity

How many solar installs has PermaCity done in California, and which license number is on its installs?

PermaCity has 56 residential solar installs interconnected in California, active in the records from 2011 through 2017 (Sep 2, 2011 to Nov 29, 2017), most of them in Los Angeles County (44), San Bernardino County (6) and Ventura County (3). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
56
Last 24 months
0
Total capacity
487.4 kW DC
Median system size
5.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
38.1% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 3, lease 12, other 1
First install
Sep 2, 2011
Latest install
Nov 29, 2017
Counties
5
Utilities
SCE 56
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201150
2012290
2013120
201460
201520
201610
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 56 interconnected installs with a tariff recorded (56) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05598.2%not counted
NEM 2.011.8%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 16 of PermaCity’s installs the utility recorded a third-party ownership type: PPA 3, lease 12, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches PermaCity exactly.

Third-party owner named on its installsInstalls
Sunpower Capital, LLC6
Sunpower Solarprogram I, LLC4
PVHome PPA 1, LLC2
Greenday Finance I, LLC1
Peikin, Roger1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 2 of PermaCity’s 56 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Aleo.

Across all years, 56 of PermaCity’s 56 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (22, 39.3%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAleo01
Canadian Solar01
Inverter makerSunPower022
Enphase019
SMA08
Fronius03
ABB02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2 of 56 installs, inverters on 56. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (4 of 56 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Los Angeles44
San Bernardino6
Ventura3
Orange2
Riverside1

Top cities

CityInstalls
Santa Monica23
Topanga4
Yucaipa4
Beverly Hills3
Culver City2
Long Beach2
Malibu2
Redlands2
Arcadia1
Canyon Country1
Huntington Beach1
Monrovia1
Newport Beach1
Ojai1
Palm Springs1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PERMACITY32
PermaCity23
Permacity1

Common questions

Where does PermaCity install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (44 installs), followed by San Bernardino County (6).

How often does PermaCity install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many PermaCity installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 56 interconnected installs with a tariff recorded (56) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.