Piper Electric

How many solar installs has Piper Electric done in California, and which license number is on its installs?

Piper Electric has 40 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Jun 8, 2021 to Oct 29, 2025), most of them in Kings County (32), Tulare County (4) and Madera County (2). CSLB lists license 1061076 (PIPER ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
7
Total capacity
179.6 kW DC
Median system size
3 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
28 installs, latest Oct 29, 2025
Ownership types recorded
none recorded
First install
Jun 8, 2021
Latest install
Oct 29, 2025
Counties
5
Utilities
PGE 34, SCE 6
CSLB license
1061076

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202110
202210
2023170
2024170
202540
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

28 of its 40 interconnected installs (70.0% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 29, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01230.0%0 (0.0%)
Net Billing Tariff2870.0%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Piper Electric’s installs. No residential system in the file lists a third-party owner name that matches Piper Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of Piper Electric’s 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used modules recorded as LONGi.

In the last 24 months, 7 of Piper Electric’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi727
Inverter makerEnphase735

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 40 of 40 installs, inverters on 40. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1061076PIPER ELECTRIC (Limited Liability)CLEARB General Building Contractor; C-10 Electrical ContractorDec 5, 2019Apr 30, 202838

License numbers are the ones the utilities recorded on the interconnection applications (38 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1061076. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kings32
Tulare4
Madera2
Fresno1
Glenn1

Top cities

CityInstalls
Lemoore29
Hanford3
Visalia3
Madera2
Fresno1
Orland1
Tulare1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PIPER ELECTRIC36
Piper Electric4

Common questions

Where does Piper Electric install solar?

Its installs are spread across 5 counties. The most are in Kings County (32 installs), followed by Tulare County (4).

How often does Piper Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 7).

How many Piper Electric installs are under NEM 3.0 (the Net Billing Tariff)?

28 of its 40 interconnected installs (70.0% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.