Renewable Solar

How many solar installs has Renewable Solar done in California, and which license number is on its installs?

Renewable Solar has 427 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Jul 30, 2007 to Apr 7, 2026), most of them in Kings County (320), Tulare County (71) and Fresno County (32). CSLB lists license 944636 (RENEWABLE SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
427
Last 24 months
7
Total capacity
5,051.8 kW DC
Median system size
10.2 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
1.0% of 404 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Oct 20, 2025
Ownership types recorded
PPA 1, lease 2, other 1
First install
Jul 30, 2007
Latest install
Apr 7, 2026
Counties
6
Utilities
SCE 292, PGE 135
CSLB license
944636

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200710
200800
200900
201020
201130
201260
2013120
2014120
2015150
2016210
2017150
2018190
2019200
2020330
2021640
2022980
2023890
2024100
202550
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 427 interconnected installs (0.9% of the 427 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 20, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08119.0%not counted
NEM 2.034280.1%0 (0.0%)
Net Billing Tariff40.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 4 of Renewable Solar’s installs the utility recorded a third-party ownership type: PPA 1, lease 2, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Renewable Solar exactly.

Third-party owner named on its installsInstalls
NRG SunCap, LLC2
La Blue, Coby1
Sunrun Installation Services1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Renewable Solar’s 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used modules recorded as Canadian Solar.

In the last 24 months, 7 of Renewable Solar’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar5237
Inverter makerSolarEdge7274
Enphase181

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 365 of 427 installs, inverters on 427. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
944636RENEWABLE SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorMar 22, 2010Nov 30, 2027425

License numbers are the ones the utilities recorded on the interconnection applications (427 of 427 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 944636. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kings320
Tulare71
Fresno32
Kern2
Los Angeles1
Orange1

Top cities

CityInstalls
Hanford246
Lemoore59
Visalia35
Tulare20
Fresno9
Laton9
Kingsburg8
Armona5
Corcoran3
Riverdale3
Three Rivers3
Woodlake3
Clovis2
Exeter2
Five Points2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RENEWABLE SOLAR257
Renewable Solar160
Renewable Solar Inc8
RENEWABLE SOLAR INC1
RENEWABLE SOLAR INC.1

Common questions

Where does Renewable Solar install solar?

Its installs are spread across 6 counties. The most are in Kings County (320 installs), followed by Tulare County (71).

How often does Renewable Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 7).

How many Renewable Solar installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 427 interconnected installs (0.9% of the 427 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources