Santa Cruz Westside Electric, Inc. DBA Sandbar has 97 residential solar installs interconnected in California, active in the records from 2010 through 2019 (Sep 8, 2010 to Oct 1, 2019), most of them in Santa Cruz County (61), Santa Clara County (15) and Monterey County (13). CSLB lists license 846294 (SANDBAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
97
Last 24 months
0
Total capacity
576.1 kW DC
Median system size
5.2 kW DC
With battery storage
1.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 97 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Sep 8, 2010
Latest install
Oct 1, 2019
Counties
7
Utilities
PGE 97
CSLB license
846294

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201110
201220
201340
201470
201500
201610
2017240
2018361
2019210
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 97 interconnected installs with a tariff recorded (97) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01818.6%not counted
NEM 2.07981.4%1 (1.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Santa Cruz Westside Electric, Inc. DBA Sandbar’s installs. No residential system in the file lists a third-party owner name that matches Santa Cruz Westside Electric, Inc. DBA Sandbar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 96 of Santa Cruz Westside Electric, Inc. DBA Sandbar’s 97 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (30, 31.3%) used modules recorded as Panasonic.

Across all years, 97 of Santa Cruz Westside Electric, Inc. DBA Sandbar’s 97 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (50, 51.5%) used inverters recorded as SolarEdge.

Across all years, 1 of Santa Cruz Westside Electric, Inc. DBA Sandbar’s 97 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic030
LG029
SolarWorld020
Seraphim03
SunPower03
Inverter makerSolarEdge050
Enphase036
SMA08
SunPower02
Schneider Electric01
Battery makerTesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 96 of 97 installs, inverters on 97. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Santa Cruz Westside Electric, Inc. DBA Sandbar as developer on 249 battery storage projects and as installer on 83 (81 name it as both), 251 projects in all with 7,219 kWh of storage. 190 have the status Paid, with $1,759,052 in current incentive allocations. Applications were received from May 1, 2017 to Jan 12, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1903,839$1,759,052
PBI in Process11,914$865,829
Reserved18366$275,801
Pending Reservation228$53,204
Cancelled391,046$464,768
RRF Rejected126$4,640

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1632,868$460,591128$357,110
Equity Resiliency621,800$1,737,45149$1,311,788
Large-Scale Storage15476$111,67013$90,154
Residential Solar and Storage Equity - AB 209 Non-POU9135$243,1140$0
Non-Residential Storage Equity11,914$865,8290$0
Not stated126$4,6400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
846294SANDBAR (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorSep 11, 2004Apr 30, 202783

License numbers are the ones the utilities recorded on the interconnection applications (84 of 97 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 846294. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Santa Cruz Westside Electric, Inc. DBA Sandbar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated Marin County84629411

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Santa Cruz61
Santa Clara15
Monterey13
Napa4
San Benito2
Contra Costa1
San Mateo1

Top cities

CityInstalls
Santa Cruz31
Watsonville8
Soquel7
Aptos6
Los Gatos5
San Jose4
Scotts Valley4
Napa3
Salinas3
Saratoga3
Seaside3
Capitola2
Carmel2
Gilroy2
Hollister2

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Santa Cruz Westside Electric, Inc. DBA Sandbar64
Santa Cruz Westside Electric dba Sandbar18
Santa Cruz Westside Electric Inc DBA San4
Santa Cruz Westside Electric, Inc dba Sa3
Santa Cruz Westside Electric, Inc. dba S3
Santa Cruz Westside Electric, dba Sandba2
Santa cruz Westside Electric1
Santa Cruz Westside Electric1
Santa Cruz Westside Electric Dba Sandbar1

Common questions

Where does Santa Cruz Westside Electric, Inc. DBA Sandbar install solar?

Its installs are spread across 7 counties. The most are in Santa Cruz County (61 installs), followed by Santa Clara County (15).

How often does Santa Cruz Westside Electric, Inc. DBA Sandbar install batteries with solar?

1.0% of its interconnected solar installs include battery storage across all years.

How many Santa Cruz Westside Electric, Inc. DBA Sandbar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 97 interconnected installs with a tariff recorded (97) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources