Sequoia Solar

How many solar installs has Sequoia Solar done in California, and which license number is on its installs?

Sequoia Solar has 133 residential solar installs interconnected in California, active in the records from 2008 through 2010 (Jun 12, 2008 to Aug 17, 2010), most of them in San Diego County (104), Riverside County (13) and Sonoma County (12). The license number recorded on most of its installs, 913373, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
133
Last 24 months
0
Total capacity
789.3 kW DC
Median system size
5.4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 26 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jun 12, 2008
Latest install
Aug 17, 2010
Counties
5
Utilities
SDGE 107, PGE 13, SCE 13
CSLB license
913373

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
2008130
2009910
2010290
201100
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 133 interconnected installs with a tariff recorded (133) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0133100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sequoia Solar’s installs. No residential system in the file lists a third-party owner name that matches Sequoia Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 90 of Sequoia Solar’s 133 installs name a module maker in the “Generator Manufacturer” fields, and most of those (77, 85.6%) used modules recorded as SunPower.

Across all years, 54 of Sequoia Solar’s 133 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (39, 72.2%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower077
Sharp010
Kyocera03
Inverter makerSMA039
SunPower014
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 90 of 133 installs, inverters on 54. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
913373Not found in the CSLB License Master file pulled Nov 4, 202613

License numbers are the ones the utilities recorded on the interconnection applications (13 of 133 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Diego104
Riverside13
Sonoma12
Orange3
Marin1

Top cities

CityInstalls
San Diego27
Del Mar14
Solana Beach12
Encinitas8
Poway6
San Marcos6
Cardiff5
Palm Desert5
Santa Rosa5
Alpine4
La Jolla4
Escondido3
Rancho Santa Fe3
Carlsbad2
Indian Wells2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sequoia Solar108
Sequoia Solar, Inc.24
Sequoia Solar Inc.1

Common questions

Where does Sequoia Solar install solar?

Its installs are spread across 5 counties. The most are in San Diego County (104 installs), followed by Riverside County (13).

How often does Sequoia Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sequoia Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 133 interconnected installs with a tariff recorded (133) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.