SOL R US INCORPORATED has 234 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jun 24, 2019 to Aug 28, 2026), most of them in Contra Costa County (167), Alameda County (36) and Solano County (21). CSLB lists license 1077212 (SOL R US INCORPORATED) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
234
Last 24 months
14
Total capacity
1,659.5 kW DC
Median system size
6.9 kW DC
With battery storage
4.3% all time; 71.4% last 24 months
Third-party owned
0.0% of 234 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
12 kWh (10 installs list a capacity)
First install
Jun 24, 2019
Latest install
Aug 28, 2026
Counties
6
Utilities
PGE 234
CSLB license
1077212

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201950
202000
2021430
2022530
20231110
2024100
202520
2026 (through Aug 31, 2026)1010

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 234 interconnected installs (5.1% of the 234 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.022294.9%0 (0.0%)
Net Billing Tariff125.1%10 (83.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOL R US INCORPORATED’s installs. No residential system in the file lists a third-party owner name that matches SOL R US INCORPORATED exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 14 of SOL R US INCORPORATED’s 14 installs name a module maker in the “Generator Manufacturer” fields, and most of those (9, 64.3%) used modules recorded as REC.

In the last 24 months, 14 of SOL R US INCORPORATED’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10, 71.4%) used inverters recorded as Tesla.

In the last 24 months, 9 of SOL R US INCORPORATED’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used batteries recorded as Tesla.

9 of 10 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC9114
JA Solar44
Qcells1not in top list
Inverter makerTesla1011
Enphase4215
Battery makerTesla99

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 223 of 234 installs, inverters on 234. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOL R US INCORPORATED as developer on 47 battery storage projects and as installer on 1 (1 name it as both), 47 projects in all with 817 kWh of storage. 30 have the status Paid, with $240,659 in current incentive allocations. Applications were received from Jul 13, 2020 to May 31, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid30613$240,659
Cancelled568$46,568
RRF Rejected12136$24,213

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage23374$67,24221$64,330
Equity Resiliency9217$199,5046$155,848
Large-Scale Storage390$20,4813$20,481
Not stated12136$24,2130$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1077212SOL R US INCORPORATED (Corporation)CLEARC-46 Solar ContractorJun 22, 2021Jun 30, 2027228

License numbers are the ones the utilities recorded on the interconnection applications (233 of 234 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1077212. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Contra Costa167
Alameda36
Solano21
Santa Clara8
Amador1
Nevada1

Top cities

CityInstalls
Walnut Creek25
Pleasant Hill24
Concord23
San Ramon15
Danville13
Vacaville10
Martinez9
Brentwood8
Lafayette8
Antioch6
Fremont6
Pittsburg6
Castro Valley5
Clayton5
Livermore5

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOL R US INCORPORATED228
Sol R Us5
Sol R US Inc1

Common questions

Where does SOL R US INCORPORATED install solar?

Its installs are spread across 6 counties. The most are in Contra Costa County (167 installs), followed by Alameda County (36).

How often does SOL R US INCORPORATED install batteries with solar?

4.3% of its interconnected solar installs include battery storage across all years, and 71.4% in the last 24 months (10 of 14).

How many SOL R US INCORPORATED installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 234 interconnected installs (5.1% of the 234 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.