Solar 360

How many solar installs has Solar 360 done in California, and which license number is on its installs?

Solar 360 has 144 residential solar installs interconnected in California, active in the records from 2013 through 2024 (Dec 18, 2013 to Oct 1, 2024), most of them in Orange County (81), San Diego County (27) and Los Angeles County (20). The license number recorded on most of its installs, 985010, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
144
Last 24 months
1
Total capacity
1,068.4 kW DC
Median system size
6.7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 105 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Oct 1, 2024
Ownership types recorded
none recorded
First install
Dec 18, 2013
Latest install
Oct 1, 2024
Counties
5
Utilities
SDGE 79, SCE 65
CSLB license
985010

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201320
2014170
2015280
2016230
201710
201800
201920
2020140
202150
2022200
2023230
202490
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 144 interconnected installs (5.6% of the 144 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Oct 1, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07149.3%not counted
NEM 2.06545.1%not recorded
Net Billing Tariff85.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar 360’s installs. No residential system in the file lists a third-party owner name that matches Solar 360 exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Solar 360’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as REC.

In the last 24 months, 1 of Solar 360’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC123
Inverter makerEnphase180

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 111 of 144 installs, inverters on 144. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar 360 as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 19 kWh of storage. 1 have the status Paid, with $1,428 in current incentive allocations. Applications were received from Dec 11, 2024 to Apr 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$1,428
Reserved110$1,428

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage219$2,8551$1,428

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
985010Not found in the CSLB License Master file pulled Nov 4, 2026138

License numbers are the ones the utilities recorded on the interconnection applications (138 of 144 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Solar 360’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022Total
unincorporated San Diego County9850104131211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange81
San Diego27
Los Angeles20
Riverside13
San Bernardino3

Top cities

CityInstalls
Coto de Caza11
Laguna Niguel11
Mission Viejo9
San Juan Capo9
Laguna Hills6
Capistrano Bch5
Corona5
San Clemente5
Cerritos4
Placentia4
El Cajon3
Ladera Ranch3
Oceanside3
San Diego3
Yorba Linda3

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar 36084
SOLAR 36036
solar 36019
Solar-3605

Common questions

Where does Solar 360 install solar?

Its installs are spread across 5 counties. The most are in Orange County (81 installs), followed by San Diego County (27).

How often does Solar 360 install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solar 360 installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 144 interconnected installs (5.6% of the 144 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.