Solar Energy 911

How many solar installs has Solar Energy 911 done in California, and which license number is on its installs?

Solar Energy 911 has 38 residential solar installs interconnected in California, active in the records from 2012 through 2017 (Oct 5, 2012 to Sep 28, 2017), most of them in Los Angeles County (20), Orange County (7) and San Bernardino County (4). CSLB lists license 967884 (SOLAR ENERGY 911) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
38
Last 24 months
0
Total capacity
223.4 kW DC
Median system size
5.7 kW DC
With battery storage
5.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
7.9 kWh (2 installs list a capacity)
First install
Oct 5, 2012
Latest install
Sep 28, 2017
Counties
6
Utilities
SCE 36, SDGE 2
CSLB license
967884

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201370
201490
201530
201671
2017111
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 38 interconnected installs with a tariff recorded (38) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03694.7%not counted
NEM 2.025.3%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar Energy 911’s installs. No residential system in the file lists a third-party owner name that matches Solar Energy 911 exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 20 of Solar Energy 911’s 38 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 65.0%) used modules recorded as SolarWorld.

Across all years, 38 of Solar Energy 911’s 38 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (28, 73.7%) used inverters recorded as SolarEdge.

Across all years, 1 of Solar Energy 911’s 38 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Ojai Energy Systems.

1 of 2 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld013
Canadian Solar02
LG02
CES01
Panasonic01
Inverter makerSolarEdge028
Enphase03
Fronius02
ABB01
LG01
Battery makerOjai Energy Systems01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 20 of 38 installs, inverters on 38. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Energy 911 as developer on 0 battery storage projects and as installer on 6 (0 name it as both), 6 projects in all with 109 kWh of storage. 2 have the status Paid, with $24,819 in current incentive allocations. Applications were received from Mar 18, 2015 to May 1, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid235$24,819
Cancelled473$49,278

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage348$24,8791$8,000
Not stated360$49,2181$16,819

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
967884SOLAR ENERGY 911 (Corporation)CLEARC-10 Electrical ContractorNov 22, 2011Nov 30, 202737

License numbers are the ones the utilities recorded on the interconnection applications (38 of 38 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 967884. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles20
Orange7
San Bernardino4
Riverside3
San Diego2
Ventura2

Top cities

CityInstalls
Long Beach4
Agoura Hills3
Alta Loma3
Palmdale3
Brea2
Mission Viejo2
Riverside2
Yorba Linda2
Altadena1
Carson1
Chino1
Culver City1
La Canada Flintridge1
La Mesa1
La Puente1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Energy 91131
SOLAR ENERGY 911 INC6
solar energy 9111

Common questions

Where does Solar Energy 911 install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (20 installs), followed by Orange County (7).

How often does Solar Energy 911 install batteries with solar?

5.6% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solar Energy 911 installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 38 interconnected installs with a tariff recorded (38) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.