SOLAR VAST ENERGY

How many solar installs has SOLAR VAST ENERGY done in California, and which license number is on its installs?

SOLAR VAST ENERGY has 253 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Feb 5, 2021 to Feb 21, 2025), most of them in Los Angeles County (150), Orange County (43) and San Bernardino County (40). The license number recorded on most of its installs, 965340, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
253
Last 24 months
4
Total capacity
2,118.2 kW DC
Median system size
7.7 kW DC
With battery storage
4.7% all time; 0.0% last 24 months
Third-party owned
2.4% of 253 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
14 installs, latest Aug 22, 2024
Ownership types recorded
lease 6
Median battery size
13 kWh (12 installs list a capacity)
First install
Feb 5, 2021
Latest install
Feb 21, 2025
Counties
4
Utilities
SCE 253
CSLB license
965340

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021410
2022671
20231146
2024295
202520
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

14 of its 253 interconnected installs (5.5% of the 253 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 35.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 22, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.023994.5%7 (2.9%)
Net Billing Tariff145.5%5 (35.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 6 of SOLAR VAST ENERGY’s installs the utility recorded a third-party ownership type: PPA 0, lease 6, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches SOLAR VAST ENERGY exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Capital, LLC4
SOLAR VAST ENERGY1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of SOLAR VAST ENERGY’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used modules recorded as SunPower.

In the last 24 months, 4 of SOLAR VAST ENERGY’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2, 50.0%) used inverters recorded as Enphase.

In the last 24 months, none of SOLAR VAST ENERGY’s 4 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

12 of 12 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower3195
Inverter makerEnphase2100
SolarEdge199
SunPower134
Battery makerSunPower012

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 240 of 253 installs, inverters on 253. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
965340Not found in the CSLB License Master file pulled Nov 4, 2026253

License numbers are the ones the utilities recorded on the interconnection applications (253 of 253 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles150
Orange43
San Bernardino40
Riverside20

Top cities

CityInstalls
Arcadia31
Walnut16
Irvine10
Ontario9
Chino Hills8
Hacienda Heights8
Rancho Cucamonga8
San Gabriel8
West Covina8
Diamond Bar7
Eastvale7
Monterey Park7
Rowland Heights7
Placentia6
Corona5

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR VAST ENERGY253

Common questions

Where does SOLAR VAST ENERGY install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (150 installs), followed by Orange County (43).

How often does SOLAR VAST ENERGY install batteries with solar?

4.7% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 4).

How many SOLAR VAST ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

14 of its 253 interconnected installs (5.5% of the 253 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 35.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.