SOLARLIFE

How many solar installs has SOLARLIFE done in California, and which license number is on its installs?

SOLARLIFE has 52 residential solar installs interconnected in California, active in the records from 2021 through 2026 (May 27, 2021 to Jun 5, 2026), most of them in Los Angeles County (35), San Bernardino County (8) and Riverside County (4). CSLB lists license 1073930 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
52
Last 24 months
14
Total capacity
441 kW DC
Median system size
7.8 kW DC
With battery storage
9.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 28.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
17.3% of 52 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15 installs, latest Jun 5, 2026
Ownership types recorded
PPA 9
Median battery size
32 kWh (5 installs list a capacity)
First install
May 27, 2021
Latest install
Jun 5, 2026
Counties
6
Utilities
SCE 51, SDGE 1
CSLB license
1073930

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202150
202280
2023140
2024121
202582
2026 (through Aug 31, 2026)52

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15 of its 52 interconnected installs (28.8% of the 52 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 26.7% of those include battery storage. The latest Net Billing Tariff install was approved Jun 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03771.2%1 (2.8%)
Net Billing Tariff1528.8%4 (26.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 9 of SOLARLIFE’s installs the utility recorded a third-party ownership type: PPA 9, lease 0, prepaid lease 0, other 0. Across all installers, 4 residential systems list a third-party owner name that matches SOLARLIFE exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
EverBright6
SolarLife3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 14 of SOLARLIFE’s 14 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 21.4%) used modules recorded as Philadelphia Solar.

In the last 24 months, 14 of SOLARLIFE’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 57.1%) used inverters recorded as SolarEdge.

In the last 24 months, 1 of SOLARLIFE’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

2 of 5 battery-paired PG&E and SCE installs (40.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPhiladelphia Solar33
Qcells37
Suzhou Talesun Solar Technologies33
Foxess2not in top list
Aptos Solar1not in top list
Inverter makerSolarEdge821
Foxess33
Growatt33
Battery makerLG12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 49 of 52 installs, inverters on 52. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLARLIFE as developer on 7 battery storage projects and as installer on 7 (7 name it as both), 7 projects in all with 173 kWh of storage. 2 have the status Paid, with $57,087 in current incentive allocations. Applications were received from Jul 24, 2021 to Jun 9, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid262$57,087
Cancelled5111$79,885

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency6138$132,4722$57,087
Small Residential Storage135$4,5000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1073930Sole owner license (name not shown)CLEAR, WC Susp PendingC-10 Electrical ContractorMar 11, 2021Mar 31, 202752

License numbers are the ones the utilities recorded on the interconnection applications (52 of 52 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1073930. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles35
San Bernardino8
Riverside4
Orange3
San Diego1
Ventura1

Top cities

CityInstalls
Arcadia5
Temple City5
San Gabriel4
West Covina3
Yucaipa3
Covina2
Diamond Bar2
El Monte2
Glendora2
Hacienda Heights2
Joshua Tree2
Monterey Park2
Rosemead2
Alhambra1
Alta Loma1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARLIFE51
SolarLife1

Common questions

Where does SOLARLIFE install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (35 installs), followed by San Bernardino County (8).

How often does SOLARLIFE install batteries with solar?

9.8% of its interconnected solar installs include battery storage across all years, and 28.6% in the last 24 months (4 of 14). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOLARLIFE installs are under NEM 3.0 (the Net Billing Tariff)?

15 of its 52 interconnected installs (28.8% of the 52 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 26.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.