Sonpower, Inc, dba Harrison Electric & Solar

How many solar installs has Sonpower, Inc, dba Harrison Electric & Solar done in California, and which license number is on its installs?

Sonpower, Inc, dba Harrison Electric & Solar has 44 residential solar installs interconnected in California, active in the records from 2015 through 2020 (May 30, 2015 to Apr 13, 2020), most of them in Los Angeles County (31), Orange County (12) and Riverside County (1). CSLB lists license 990803 (HARRISON ELECTRIC SOLAR) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
0
Total capacity
298.2 kW DC
Median system size
6.7 kW DC
With battery storage
18.2% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
13 kWh (8 installs list a capacity)
First install
May 30, 2015
Latest install
Apr 13, 2020
Counties
3
Utilities
SCE 44
CSLB license
990803

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015110
2016100
2017110
201831
201975
202022
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03170.5%not counted
NEM 2.01329.5%7 (53.8%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sonpower, Inc, dba Harrison Electric & Solar’s installs. No residential system in the file lists a third-party owner name that matches Sonpower, Inc, dba Harrison Electric & Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 44 of Sonpower, Inc, dba Harrison Electric & Solar’s 44 installs name a module maker in the “Generator Manufacturer” fields, and most of those (35, 79.5%) used modules recorded as SolarWorld.

Across all years, 44 of Sonpower, Inc, dba Harrison Electric & Solar’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (43, 97.7%) used inverters recorded as Enphase.

0 of 8 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld035
Solaria08
Eguana05
Enphase01
Evolve01
Inverter makerEnphase043
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 44 installs, inverters on 44. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sonpower, Inc, dba Harrison Electric & Solar as developer on 10 battery storage projects and as installer on 10 (10 name it as both), 10 projects in all with 122 kWh of storage. 8 have the status Paid, with $22,753 in current incentive allocations. Applications were received from Jun 28, 2019 to Jul 6, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid897$22,753
Cancelled226$4,968

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage10122$27,7218$22,753

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990803HARRISON ELECTRIC SOLAR (Corporation)Contr Bond SuspC-10 Electrical ContractorFeb 21, 2014Feb 29, 202844

License numbers are the ones the utilities recorded on the interconnection applications (44 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 990803. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles31
Orange12
Riverside1

Top cities

CityInstalls
Whittier21
La Habra5
La Mirada3
Brea2
Cerritos2
Long Beach2
Arcadia1
Artesia1
Costa Mesa1
Eastvale1
Fountain Valley1
Fullerton1
La Habra Heights1
Orange1
Tustin1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sonpower, Inc, dba Harrison Electric & Solar23
SONPOWER INC14
Sonpower, Inc dba Harrison Electric & Solar3
Sonpower, Inc1
Sonpower, inc dba Harrison Electric & Solar1
Sonpower, inc, dba Harrison Electric & Solar1
Sonpower, Inc., dba Harrison Electric & Solar1

Common questions

Where does Sonpower, Inc, dba Harrison Electric & Solar install solar?

Its installs are spread across 3 counties. The most are in Los Angeles County (31 installs), followed by Orange County (12).

How often does Sonpower, Inc, dba Harrison Electric & Solar install batteries with solar?

18.2% of its interconnected solar installs include battery storage across all years.

How many Sonpower, Inc, dba Harrison Electric & Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.