Sun Diego Solar Construction LLC has 101 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Sep 22, 2017 to May 29, 2026), most of them in San Diego County (101). CSLB lists license 1016182 (SUN DIEGO SOLAR CONSTRUCTION LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
101
Last 24 months
13
Total capacity
616.3 kW DC
Median system size
5.4 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17 installs, latest May 14, 2026
Ownership types recorded
none recorded
First install
Sep 22, 2017
Latest install
May 29, 2026
Counties
1
Utilities
SDGE 101
CSLB license
1016182

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201720
201840
2019190
2020110
2021100
2022170
2023160
2024120
202560
2026 (through Aug 31, 2026)40

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17 of its 101 interconnected installs (16.8% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved May 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08483.2%not recorded
Net Billing Tariff1716.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sun Diego Solar Construction LLC’s installs. No residential system in the file lists a third-party owner name that matches Sun Diego Solar Construction LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of Sun Diego Solar Construction LLC’s 13 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 53.8%) used modules recorded as Qcells.

In the last 24 months, 13 of Sun Diego Solar Construction LLC’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (6, 46.2%) used inverters recorded as Generac.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells748
Axitec38
UnitedRenewableEnergyCo.,Ltd.213
SEGSolarInc.1not in top list
Inverter makerGenerac66
Enphase417
ChiliconPower,LLC250
Tesla1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 97 of 101 installs, inverters on 101. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1016182SUN DIEGO SOLAR CONSTRUCTION LLC (Limited Liability)CLEARB General Building ContractorJul 15, 2016Jul 31, 2028101

License numbers are the ones the utilities recorded on the interconnection applications (101 of 101 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1016182. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sun Diego Solar Construction LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County10161824104561322248

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego101

Top cities

CityInstalls
El Cajon22
San Diego21
Chula Vista12
Lakeside11
Santee9
La Mesa7
Alpine6
Coronado2
Bonsall1
Descanso1
Dulzura1
Encinitas1
Jamul1
Julian1
La Jolla1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sun Diego Solar Construction LLC101

Common questions

Where does Sun Diego Solar Construction LLC install solar?

Its installs are spread across 1 county. The most are in San Diego County (101 installs).

How often does Sun Diego Solar Construction LLC install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Sun Diego Solar Construction LLC installs are under NEM 3.0 (the Net Billing Tariff)?

17 of its 101 interconnected installs (16.8% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.