SUN POWER BY SUN SOLAR

How many solar installs has SUN POWER BY SUN SOLAR done in California, and which license number is on its installs?

SUN POWER BY SUN SOLAR has 274 residential solar installs interconnected in California, active in the records from 2019 through 2022 (Dec 3, 2019 to Mar 15, 2022), most of them in Kern County (228), Fresno County (39) and Kings County (4). The license number recorded on most of its installs, 974930, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
274
Last 24 months
0
Total capacity
2,492.7 kW DC
Median system size
8.3 kW DC
With battery storage
2.2% all time; no installs in the last 24 months last 24 months
Third-party owned
42.3% of 274 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 116
First install
Dec 3, 2019
Latest install
Mar 15, 2022
Counties
5
Utilities
PGE 274
CSLB license
974930

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019580
20202146
202110
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 274 interconnected installs with a tariff recorded (274) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0274100.0%6 (2.2%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 116 of SUN POWER BY SUN SOLAR’s installs the utility recorded a third-party ownership type: PPA 0, lease 116, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SUN POWER BY SUN SOLAR exactly.

Third-party owner named on its installsInstalls
Sunpower Capital LLC114
Sun Power Capital LLC1
sunpower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 260 of SUN POWER BY SUN SOLAR’s 274 installs name a module maker in the “Generator Manufacturer” fields, and most of those (260, 100.0%) used modules recorded as SunPower.

Across all years, 274 of SUN POWER BY SUN SOLAR’s 274 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (235, 85.8%) used inverters recorded as Enphase.

Across all years, 4 of SUN POWER BY SUN SOLAR’s 274 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used batteries recorded as Tesla.

4 of 6 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0260
Inverter makerEnphase0235
SunPower043
Tesla06
Fronius02
Power-One01
Battery makerTesla04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 260 of 274 installs, inverters on 274. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
974930Not found in the CSLB License Master file pulled Nov 4, 2026274

License numbers are the ones the utilities recorded on the interconnection applications (274 of 274 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Kern228
Fresno39
Kings4
Madera2
Tulare1

Top cities

CityInstalls
Bakersfield221
Fresno25
Clovis10
Shafter3
Taft3
Lemoore2
Madera2
Sanger2
Hanford1
Kingsburg1
Laton1
Mc Farland1
Orange Cove1
Tulare1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUN POWER BY SUN SOLAR274

Common questions

Where does SUN POWER BY SUN SOLAR install solar?

Its installs are spread across 5 counties. The most are in Kern County (228 installs), followed by Fresno County (39).

How often does SUN POWER BY SUN SOLAR install batteries with solar?

2.2% of its interconnected solar installs include battery storage across all years.

How many SUN POWER BY SUN SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 274 interconnected installs with a tariff recorded (274) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.