SUNNY CREEK SOLAR AND MAINTENANCE

How many solar installs has SUNNY CREEK SOLAR AND MAINTENANCE done in California, and which license number is on its installs?

SUNNY CREEK SOLAR AND MAINTENANCE has 39 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jun 24, 2022 to Apr 27, 2026), most of them in Yolo County (14), Yuba County (9) and Butte County (4). CSLB lists license 1076156 (SUNNY CREEK SOLAR AND MAINTENANCE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
24
Total capacity
211.7 kW DC
Median system size
4.5 kW DC
With battery storage
12.8% all time; 12.5% last 24 months
Third-party owned
5.1% of 39 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
24 installs, latest Apr 10, 2026
Ownership types recorded
other 2
First install
Jun 24, 2022
Latest install
Apr 27, 2026
Counties
9
Utilities
PGE 39
CSLB license
1076156

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202230
202390
202462
2025152
2026 (through Aug 31, 2026)61

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

24 of its 39 interconnected installs (61.5% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 16.7% of those include battery storage. The latest Net Billing Tariff install was approved Apr 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01538.5%1 (6.7%)
Net Billing Tariff2461.5%4 (16.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of SUNNY CREEK SOLAR AND MAINTENANCE’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches SUNNY CREEK SOLAR AND MAINTENANCE exactly.

Third-party owner named on its installsInstalls
R&E Enterprise LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 23 of SUNNY CREEK SOLAR AND MAINTENANCE’s 24 installs name a module maker in the “Generator Manufacturer” fields, and most of those (16, 69.6%) used modules recorded as Qcells.

In the last 24 months, 24 of SUNNY CREEK SOLAR AND MAINTENANCE’s 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 83.3%) used inverters recorded as Enphase.

In the last 24 months, 2 of SUNNY CREEK SOLAR AND MAINTENANCE’s 24 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

4 of 5 battery-paired PG&E and SCE installs (80.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1625
Hyperion Solar33
Znshine33
Silfab1not in top list
Inverter makerEnphase2034
APsystems (Altenergy Power System)22
Tesla23
Fronius11
SolarEdge1not in top list
Battery makerEnphase12
Tesla12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 35 of 39 installs, inverters on 39. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1076156SUNNY CREEK SOLAR AND MAINTENANCE INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 24, 2021Jan 31, 202839

License numbers are the ones the utilities recorded on the interconnection applications (39 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1076156. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Yolo14
Yuba9
Butte4
Solano4
Placer3
Contra Costa2
Napa1
Santa Clara1
Sutter1

Top cities

CityInstalls
Olivehurst9
Esparto5
Winters5
Paradise4
Woodland4
Concord1
Dixon1
El Macero1
El Sobrante1
Fairfield1
Granite Bay1
Lincoln1
Napa1
Rocklin1
Sunnyvale1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNNY CREEK SOLAR AND MAINTENANCE36
SUNNY CREEK SOLAR AND MAINTENANCE INC3

Common questions

Where does SUNNY CREEK SOLAR AND MAINTENANCE install solar?

Its installs are spread across 9 counties. The most are in Yolo County (14 installs), followed by Yuba County (9).

How often does SUNNY CREEK SOLAR AND MAINTENANCE install batteries with solar?

12.8% of its interconnected solar installs include battery storage across all years, and 12.5% in the last 24 months (3 of 24).

How many SUNNY CREEK SOLAR AND MAINTENANCE installs are under NEM 3.0 (the Net Billing Tariff)?

24 of its 39 interconnected installs (61.5% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 16.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.