Treepublic Energy

How many solar installs has Treepublic Energy done in California, and which license number is on its installs?

Treepublic Energy has 194 residential solar installs interconnected in California, active in the records from 2015 through 2022 (Dec 17, 2015 to Jun 3, 2022), most of them in Los Angeles County (130), Ventura County (32) and San Bernardino County (14). CSLB lists license 996593 (TREEPUBLIC SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
194
Last 24 months
0
Total capacity
1,606.8 kW DC
Median system size
7.2 kW DC
With battery storage
17.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 194 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
16.8 kWh (33 installs list a capacity)
First install
Dec 17, 2015
Latest install
Jun 3, 2022
Counties
7
Utilities
SCE 192, SDGE 2
CSLB license
996593

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201540
201690
2017170
2018180
2019260
2020372
20215820
20222511
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 194 interconnected installs with a tariff recorded (194) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02010.3%not counted
NEM 2.017489.7%33 (19.1%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Treepublic Energy’s installs. No residential system in the file lists a third-party owner name that matches Treepublic Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 185 of Treepublic Energy’s 194 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (79, 42.7%) used modules recorded as LG.

Across all years, 194 of Treepublic Energy’s 194 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (121, 62.4%) used inverters recorded as Enphase.

Across all years, 29 of Treepublic Energy’s 194 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (26, 89.7%) used batteries recorded as Enphase.

29 of 33 battery-paired PG&E and SCE installs (87.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG079
REC043
Panasonic036
SolarWorld010
Canadian Solar05
Inverter makerEnphase0121
SolarEdge053
SunPower09
Tesla05
Delta Electronics04
Battery makerEnphase026
sonnen02
Encharge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 185 of 194 installs, inverters on 194. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Treepublic Energy as developer on 0 battery storage projects and as installer on 21 (0 name it as both), 21 projects in all with 345 kWh of storage. 20 have the status Paid, with $101,601 in current incentive allocations. Applications were received from May 11, 2020 to Oct 17, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid20337$101,601
Cancelled18$2,081

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage16225$41,73715$39,656
Large-Scale Storage384$26,3583$26,358
Equity Resiliency236$35,5882$35,588

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
996593TREEPUBLIC SOLAR (Corporation)CLEAR, WC Susp PendingC-10 Electrical Contractor; C-46 Solar ContractorSep 10, 2014Apr 30, 2028191

License numbers are the ones the utilities recorded on the interconnection applications (193 of 194 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 996593. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles130
Ventura32
San Bernardino14
Riverside11
Orange5
San Diego1
Santa Barbara1

Top cities

CityInstalls
Simi Valley13
Torrance11
Santa Clarita10
Culver City9
San Gabriel8
Valencia8
Malibu6
Thousand Oaks6
South Pasadena5
Altadena4
Castaic4
Manhattan Beach4
Moorpark4
Rancho Palos Verdes4
Redondo Beach4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TREEPUBLIC ENERGY173
Treepublic Energy21

Common questions

Where does Treepublic Energy install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (130 installs), followed by Ventura County (32).

How often does Treepublic Energy install batteries with solar?

17.2% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Treepublic Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 194 interconnected installs with a tariff recorded (194) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.