True Renewable Energy

How many solar installs has True Renewable Energy done in California, and which license number is on its installs?

True Renewable Energy has 110 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jun 29, 2018 to Jan 15, 2026), most of them in Alameda County (30), Contra Costa County (28) and Solano County (16). The license number recorded on most of its installs, 464408, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
110
Last 24 months
3
Total capacity
460.8 kW DC
Median system size
3.8 kW DC
With battery storage
0.9% all time; 0.0% last 24 months
Third-party owned
0.0% of 110 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Jan 15, 2026
Ownership types recorded
none recorded
First install
Jun 29, 2018
Latest install
Jan 15, 2026
Counties
10
Utilities
PGE 110
CSLB license
464408

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018140
2019220
2020380
2021110
202200
202370
2024151
202520
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 110 interconnected installs (19.1% of the 110 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 4.8% of those include battery storage. The latest Net Billing Tariff install was approved Jan 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08980.9%0 (0.0%)
Net Billing Tariff2119.1%1 (4.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on True Renewable Energy’s installs. No residential system in the file lists a third-party owner name that matches True Renewable Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of True Renewable Energy’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used modules recorded as Qcells.

In the last 24 months, 3 of True Renewable Energy’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of True Renewable Energy’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3101
Inverter makerEnphase392
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 109 of 110 installs, inverters on 110. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
464408Not found in the CSLB License Master file pulled Nov 4, 2026110

License numbers are the ones the utilities recorded on the interconnection applications (110 of 110 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Alameda30
Contra Costa28
Solano16
San Joaquin15
Santa Clara8
San Mateo4
Sonoma4
Marin2
Santa Cruz2
San Francisco1

Top cities

CityInstalls
Oakland18
Stockton9
Vallejo9
Antioch6
San Jose6
Richmond5
Brentwood4
Concord3
Hayward3
Manteca3
Martinez3
Redwood City3
Benicia2
Castro Valley2
Fairfield2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TRUE RENEWABLE ENERGY INC39
TRUE RENEWABLE ENERGY INCORPORATED39
True Renewable Energy32

Common questions

Where does True Renewable Energy install solar?

Its installs are spread across 10 counties. The most are in Alameda County (30 installs), followed by Contra Costa County (28).

How often does True Renewable Energy install batteries with solar?

0.9% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 3).

How many True Renewable Energy installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 110 interconnected installs (19.1% of the 110 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 4.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.