W S E INC

How many solar installs has W S E INC done in California, and which license number is on its installs?

W S E INC has 39 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Nov 29, 2018 to Aug 7, 2026), most of them in Ventura County (37) and Los Angeles County (2). CSLB lists license 941405 (W S E INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
11
Total capacity
319.9 kW DC
Median system size
6.8 kW DC
With battery storage
59.0% all time; 90.9% last 24 months
Third-party owned
0.0% of 39 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Aug 7, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (23 installs list a capacity)
First install
Nov 29, 2018
Latest install
Aug 7, 2026
Counties
2
Utilities
SCE 39
CSLB license
941405

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
201920
202052
202154
202242
202362
202464
202598
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 39 interconnected installs (17.9% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03282.1%18 (56.3%)
Net Billing Tariff717.9%5 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on W S E INC’s installs. No residential system in the file lists a third-party owner name that matches W S E INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of W S E INC’s 11 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 50.0%) used modules recorded as Silfab.

In the last 24 months, 11 of W S E INC’s 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 54.5%) used inverters recorded as Tesla.

In the last 24 months, 10 of W S E INC’s 11 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 80.0%) used batteries recorded as Tesla.

23 of 23 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab55
Qcells216
REC22
JA Solar1not in top list
LG114
Inverter makerTesla66
Enphase315
SMA22
SolarEdge115
Battery makerTesla89
Enphase27

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 38 of 39 installs, inverters on 39. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
941405W S E INC (Corporation)CLEARC-10 Electrical ContractorDec 23, 2009Jul 31, 202739

License numbers are the ones the utilities recorded on the interconnection applications (39 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 941405. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Ventura37
Los Angeles2

Top cities

CityInstalls
Ventura18
Ojai7
Camarillo5
Santa Paula3
Oxnard2
Fillmore1
Malibu1
Thousand Oaks1
Westlake Village1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
W S E INC39

Common questions

Where does W S E INC install solar?

Its installs are spread across 2 counties. The most are in Ventura County (37 installs), followed by Los Angeles County (2).

How often does W S E INC install batteries with solar?

59.0% of its interconnected solar installs include battery storage across all years, and 90.9% in the last 24 months (10 of 11).

How many W S E INC installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 39 interconnected installs (17.9% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.