Home solar in ZIP code 95366, California

Service city recorded on most installs: Ripon. County: San Joaquin County.

How many homes in ZIP code 95366 have solar?

PG&E, SCE and SDG&E interconnected 1,417 residential solar systems in ZIP code 95366 through Aug 31, 2026, 167 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Ripon, San Joaquin County, as the service city on 1,416 of them. Sunrun has the most installs recorded in this ZIP, 179.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
1,417
Last 24 months
167 (Sep 2024 through Aug 2026)
Capacity
11.2 MW DC
Median system size
7.3 kW DC
Net Billing Tariff (NEM 3.0)
207 installs, 14.6% of those with a tariff recorded
Utility
PGE 1,417
First install in data
Nov 19, 2002
Latest install in data
Aug 24, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200210
200300
200420
200530
200610
200700
200820
200930
201090
201170
2012190
2013360
2014470
20151310
20161350
2017790
20181123
20191183
2020885
20211288
202213015
202314113
202410182
20257668
2026 (through Aug 31, 2026)4840

Battery storage

16.7% of the residential solar installs here include battery storage across all years (237 of 1,417). In the last 24 months the share was 86.8% (145 of 167).

Net metering tariff

Of the 1,417 installs with a net metering tariff recorded: NEM 1.0 403 (28.4%), NEM 2.0 807 (57.0%), the Net Billing Tariff (often called NEM 3.0) 207 (14.6%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

23.4% of the 1,417 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 1,085 are recorded as not third-party owned. Ownership types recorded: PPA 281, lease 47, other 4.

Installers by installs in 95366

Installers with a page in this index, most installs in this ZIP first. 156 such installers have at least one install here. 84 more installs were by 49 installer names without a page in this index. 51 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95366Last 24 months
Sunrun17955
Tesla Energy Operations (formerly SolarCity)1218
Kurios Energy840
Vivint Solar Developer, LLC770
Future Energy Corporation492
SunPower431
SIG SOLAR, S.I.G.4113
CALIFORNIA SOLAR INNOVATORS INC392
Mid-State Solar393
1st Light Energy Inc370

City and county recorded for 95366

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Ripon1,416
County: San Joaquin County1,417

1 other city value on 1 install, each under 1% of this ZIP’s installs, are not listed.

Common questions

How common are home batteries with solar in 95366?

16.7% of the residential solar installs here include battery storage across all years (237 of 1,417). In the last 24 months the share was 86.8% (145 of 167).

How many solar installs in 95366 are under NEM 3.0?

207 of the 1,417 installs here with a tariff recorded (14.6%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95366?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (179), Tesla Energy Operations (formerly SolarCity) (121), Kurios Energy (84). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.