CALIFORNIA SOLAR INNOVATORS INC

How many solar installs has CALIFORNIA SOLAR INNOVATORS INC done in California, and which license number is on its installs?

CALIFORNIA SOLAR INNOVATORS INC has 190 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Apr 21, 2014 to Jan 15, 2026), most of them in San Joaquin County (91), Solano County (27) and Stanislaus County (16). CSLB lists license 980699 (CALIFORNIA SOLAR INNOVATORS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
190
Last 24 months
2
Total capacity
1,948.7 kW DC
Median system size
7.9 kW DC
With battery storage
5.3% all time; 0.0% last 24 months
Third-party owned
0.0% of 190 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Jan 15, 2026
Ownership types recorded
none recorded
First install
Apr 21, 2014
Latest install
Jan 15, 2026
Counties
18
Utilities
PGE 189, SCE 1
CSLB license
980699

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201430
201540
201650
201710
201810
2019180
2020442
2021250
2022334
2023534
202420
202500
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 190 interconnected installs (2.6% of the 190 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0126.3%not counted
NEM 2.017391.1%8 (4.6%)
Net Billing Tariff52.6%2 (40.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CALIFORNIA SOLAR INNOVATORS INC’s installs. No residential system in the file lists a third-party owner name that matches CALIFORNIA SOLAR INNOVATORS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of CALIFORNIA SOLAR INNOVATORS INC’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as REC.

In the last 24 months, 2 of CALIFORNIA SOLAR INNOVATORS INC’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of CALIFORNIA SOLAR INNOVATORS INC’s 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

9 of 10 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC142
SunPower1123
Inverter makerEnphase2102
Battery makerTesla05
SunPower04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 178 of 190 installs, inverters on 190. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CALIFORNIA SOLAR INNOVATORS INC as developer on 9 battery storage projects and as installer on 2 (2 name it as both), 9 projects in all with 14,834 kWh of storage. 2 have the status Paid, with $4,640 in current incentive allocations. Applications were received from Aug 19, 2020 to Aug 4, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid226$4,640
PBI in Process36,866$1,280,695
Reserved12,122$379,809
Cancelled15,794$812,500
RRF Rejected226$3,480

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage514,781$2,473,0040$0
Small Residential Storage226$4,6402$4,640
Not stated226$3,4800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
980699CALIFORNIA SOLAR INNOVATORS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJan 28, 2013Jan 31, 2027190

License numbers are the ones the utilities recorded on the interconnection applications (190 of 190 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 980699. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin91
Solano27
Stanislaus16
Amador14
Calaveras10
Alameda9
Merced5
Tuolumne4
Fresno3
Sutter3
Contra Costa1
El Dorado1
Madera1
Mariposa1
Placer1
Sonoma1
Tulare1
Yolo1

Top cities

CityInstalls
Ripon39
Fairfield27
Escalon16
Manteca15
Oakdale14
Stockton10
Ione9
Tracy7
Angels Camp6
Sonora4
Castro Valley3
Livermore3
Merced3
San Leandro3
Yuba City3

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALIFORNIA SOLAR INNOVATORS INC176
California Solar Innovators Inc.13
California Solar Innovators, Inc. dba CA1

Common questions

Where does CALIFORNIA SOLAR INNOVATORS INC install solar?

Its installs are spread across 18 counties. The most are in San Joaquin County (91 installs), followed by Solano County (27).

How often does CALIFORNIA SOLAR INNOVATORS INC install batteries with solar?

5.3% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2).

How many CALIFORNIA SOLAR INNOVATORS INC installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 190 interconnected installs (2.6% of the 190 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.