ABOVE BOARD CONSTRUCTION & ROOFING INC

How many solar installs has ABOVE BOARD CONSTRUCTION & ROOFING INC done in California, and which license number is on its installs?

ABOVE BOARD CONSTRUCTION & ROOFING INC has 79 residential solar installs interconnected in California, active in the records from 2021 through 2026 (May 28, 2021 to Aug 19, 2026), most of them in Shasta County (46), Humboldt County (17) and San Diego County (4). CSLB lists license 792707 (ABOVE BOARD CONSTRUCTION & ROOFING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
79
Last 24 months
17
Total capacity
595.2 kW DC
Median system size
6.2 kW DC
With battery storage
18.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 58.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 79 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
19 installs, latest Aug 19, 2026
Ownership types recorded
none recorded
First install
May 28, 2021
Latest install
Aug 19, 2026
Counties
11
Utilities
PGE 74, SDGE 4, SCE 1
CSLB license
792707

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021110
2022101
2023332
2024102
202586
2026 (through Aug 31, 2026)73

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

19 of its 79 interconnected installs (24.1% of the 79 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 52.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06075.9%4 (7.1%)
Net Billing Tariff1924.1%10 (52.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ABOVE BOARD CONSTRUCTION & ROOFING INC’s installs. No residential system in the file lists a third-party owner name that matches ABOVE BOARD CONSTRUCTION & ROOFING INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of ABOVE BOARD CONSTRUCTION & ROOFING INC’s 17 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 47.1%) used modules recorded as Qcells.

In the last 24 months, 17 of ABOVE BOARD CONSTRUCTION & ROOFING INC’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 47.1%) used inverters recorded as Enphase.

In the last 24 months, 10 of ABOVE BOARD CONSTRUCTION & ROOFING INC’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 60.0%) used batteries recorded as Tesla.

14 of 14 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells837
CertainTeed55
GAF Energy LLC321
JA Solar2not in top list
Silfab1not in top list
Inverter makerEnphase846
Tesla67
Delta Electronics321
SolarEdge17
Battery makerTesla67
Enphase47

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 79 of 79 installs, inverters on 79. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
792707ABOVE BOARD CONSTRUCTION & ROOFING INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing ContractorMar 19, 2001Oct 31, 202879

License numbers are the ones the utilities recorded on the interconnection applications (79 of 79 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 792707. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ABOVE BOARD CONSTRUCTION & ROOFING INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated San Diego County79270722

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Shasta46
Humboldt17
San Diego4
Tehama3
Butte2
Plumas2
Alameda1
Kings1
Mariposa1
Stanislaus1
Yuba1

Top cities

CityInstalls
Anderson20
Redding15
Eureka8
Cottonwood5
Palo Cedro5
Mckinleyville4
Arcata2
Chico2
El Cajon2
Quincy2
Red Bluff2
Ferndale1
Fortuna1
Hanford1
La Grange1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ABOVE BOARD CONSTRUCTION & ROOFING INC74
Above Board Construction and Roofing4
Above Board Construction & Roofing1

Common questions

Where does ABOVE BOARD CONSTRUCTION & ROOFING INC install solar?

Its installs are spread across 11 counties. The most are in Shasta County (46 installs), followed by Humboldt County (17).

How often does ABOVE BOARD CONSTRUCTION & ROOFING INC install batteries with solar?

18.7% of its interconnected solar installs include battery storage across all years, and 58.8% in the last 24 months (10 of 17). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ABOVE BOARD CONSTRUCTION & ROOFING INC installs are under NEM 3.0 (the Net Billing Tariff)?

19 of its 79 interconnected installs (24.1% of the 79 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 52.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.