AHSOLAR PRO SOLUTIONS

How many solar installs has AHSOLAR PRO SOLUTIONS done in California, and which license number is on its installs?

AHSOLAR PRO SOLUTIONS has 41 residential solar installs interconnected in California, active in the records from 2024 through 2026 (May 22, 2024 to Aug 21, 2026), most of them in Alameda County (17), Santa Clara County (12) and San Mateo County (8). CSLB lists license 1006946 (AHSOLAR PRO SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
41
Last 24 months
39
Total capacity
241.1 kW DC
Median system size
5.9 kW DC
With battery storage
87.8% all time; 87.2% last 24 months
Third-party owned
0.0% of 41 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
38 installs, latest Aug 21, 2026
Ownership types recorded
none recorded
Median battery size
13.8 kWh (2 installs list a capacity)
First install
May 22, 2024
Latest install
Aug 21, 2026
Counties
5
Utilities
PGE 41
CSLB license
1006946

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202455
20251714
2026 (through Aug 31, 2026)1917

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

38 of its 41 interconnected installs (92.7% of the 41 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.037.3%2 (66.7%)
Net Billing Tariff3892.7%34 (89.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on AHSOLAR PRO SOLUTIONS’s installs. No residential system in the file lists a third-party owner name that matches AHSOLAR PRO SOLUTIONS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 37 of AHSOLAR PRO SOLUTIONS’ 39 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 40.5%) used modules recorded as Hyundai.

In the last 24 months, 39 of AHSOLAR PRO SOLUTIONS’ 39 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 66.7%) used inverters recorded as Tesla.

In the last 24 months, 31 of AHSOLAR PRO SOLUTIONS’ 39 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (22, 71.0%) used batteries recorded as Tesla.

33 of 36 battery-paired PG&E and SCE installs (91.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai1515
REC1010
SunPower88
Qcells35
Canadian Solar11
Inverter makerTesla2626
Enphase1618
FranklinWH11
Kaco11
Xantrex11
Battery makerTesla2222
Enphase810
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 41 installs, inverters on 41. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1006946AHSOLAR PRO SOLUTIONS (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorAug 28, 2015Jan 31, 202741

License numbers are the ones the utilities recorded on the interconnection applications (41 of 41 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1006946. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list AHSOLAR PRO SOLUTIONS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202025Total
City and County of San Francisco1006946156

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda17
Santa Clara12
San Mateo8
Contra Costa3
San Francisco1

Top cities

CityInstalls
Fremont7
San Leandro4
San Mateo4
Los Altos Hills3
San Jose3
Sunnyvale2
Union City2
Burlingame1
Campbell1
Castro Valley1
Foster City1
Hayward1
Hillsborough1
Los Altos1
Milpitas1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AHSOLAR PRO SOLUTIONS41

Common questions

Where does AHSOLAR PRO SOLUTIONS install solar?

Its installs are spread across 5 counties. The most are in Alameda County (17 installs), followed by Santa Clara County (12).

How often does AHSOLAR PRO SOLUTIONS install batteries with solar?

87.8% of its interconnected solar installs include battery storage across all years, and 87.2% in the last 24 months (34 of 39).

How many AHSOLAR PRO SOLUTIONS installs are under NEM 3.0 (the Net Billing Tariff)?

38 of its 41 interconnected installs (92.7% of the 41 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.