American Electrical Services Inc.

How many solar installs has American Electrical Services Inc. done in California, and which license number is on its installs?

American Electrical Services Inc. has 81 residential solar installs interconnected in California, active in the records from 2010 through 2022 (May 4, 2010 to Jul 22, 2022), most of them in San Benito County (49), Santa Cruz County (21) and Santa Clara County (3). CSLB lists license 569761 (AES COMPANIES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
81
Last 24 months
0
Total capacity
738.8 kW DC
Median system size
6.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 81 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 4, 2010
Latest install
Jul 22, 2022
Counties
9
Utilities
PGE 79, SCE 2
CSLB license
569761

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201120
201210
2013180
2014170
2015100
2016110
201730
2018100
201920
202030
202120
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 81 interconnected installs with a tariff recorded (81) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06074.1%not counted
NEM 2.02125.9%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on American Electrical Services Inc.’s installs. No residential system in the file lists a third-party owner name that matches American Electrical Services Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 80 of American Electrical Services Inc.’s 81 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (38, 47.5%) used modules recorded as ET Solar Industry, Ltd..

Across all years, 81 of American Electrical Services Inc.’s 81 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (38, 46.9%) used inverters recorded as ET Solar Industry, Ltd..

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerET Solar Industry, Ltd.038
SolarWorld013
Canadian Solar011
Qcells07
Sharp02
Inverter makerET Solar Industry, Ltd.038
Fronius018
Enphase017
SolarEdge05
SMA02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 80 of 81 installs, inverters on 81. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
569761AES COMPANIES INC (Corporation)CLEARC-10 Electrical ContractorJun 5, 1989Jul 31, 202755

License numbers are the ones the utilities recorded on the interconnection applications (57 of 81 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 569761. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Benito49
Santa Cruz21
Santa Clara3
Kern2
Monterey2
Merced1
Orange1
San Mateo1
Tulare1

Top cities

CityInstalls
Hollister46
Aptos18
Bakersfield2
Santa Cruz2
Tres Pinos2
Corona del Mar1
Gilroy1
Los Banos1
Los Gatos1
Marina1
Mountain View1
Salinas1
San Carlos1
San Juan Bautista1
Tulare1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
American Electrical Services Inc.49
American Electrical Services Inc12
AMERICAN ELECTRICAL SERVICES INC6
American Electrical Services, Inc.6
American Electrical Services5
AMERICAN ELECTRICAL SERVICES2
American Electrical Services inc.1

Common questions

Where does American Electrical Services Inc. install solar?

Its installs are spread across 9 counties. The most are in San Benito County (49 installs), followed by Santa Cruz County (21).

How often does American Electrical Services Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many American Electrical Services Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 81 interconnected installs with a tariff recorded (81) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.