Best Solar Power Inc

How many solar installs has Best Solar Power Inc done in California, and which license number is on its installs?

Best Solar Power Inc has 505 residential solar installs interconnected in California, active in the records from 2015 through 2024 (Mar 4, 2015 to Mar 19, 2024), most of them in Los Angeles County (327), Orange County (69) and Ventura County (62). CSLB lists license 988425 (BEST SOLAR POWER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
505
Last 24 months
0
Total capacity
2,470.8 kW DC
Median system size
4.3 kW DC
With battery storage
0.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 502 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Mar 19, 2024
Ownership types recorded
none recorded
Median battery size
13.5 kWh (1 installs list a capacity)
First install
Mar 4, 2015
Latest install
Mar 19, 2024
Counties
7
Utilities
SCE 490, SDGE 15
CSLB license
988425

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015170
2016640
2017700
2018100
2019950
20201360
2021741
2022290
202390
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 505 interconnected installs (0.8% of the 505 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 19, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011623.0%not counted
NEM 2.038576.2%1 (0.3%)
Net Billing Tariff40.8%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Best Solar Power Inc’s installs. No residential system in the file lists a third-party owner name that matches Best Solar Power Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 493 of Best Solar Power Inc’s 505 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (204, 41.4%) used modules recorded as LG.

Across all years, 505 of Best Solar Power Inc’s 505 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (396, 78.4%) used inverters recorded as SolarEdge.

Across all years, 1 of Best Solar Power Inc’s 505 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0204
SolarWorld0197
Mission Solar041
SunPower037
Canadian Solar04
Inverter makerSolarEdge0396
Enphase054
APsystems (Altenergy Power System)024
SunPower012
Power-One05
Battery makerTesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 493 of 505 installs, inverters on 505. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
988425BEST SOLAR POWER INC (Corporation)CLEAR, Pending Case/CITB General Building Contractor; C-10 Electrical ContractorNov 13, 2013Nov 30, 2027500

License numbers are the ones the utilities recorded on the interconnection applications (505 of 505 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 988425. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Best Solar Power Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County98842522

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles327
Orange69
Ventura62
San Bernardino34
San Diego9
Riverside3
Kern1

Top cities

CityInstalls
Long Beach24
Lancaster19
Los Angeles17
Altadena16
Simi Valley13
Ventura12
Inglewood11
Whittier11
Oxnard10
Palmdale10
Torrance10
Camarillo9
Fontana9
Carson8
Bellflower7

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BEST SOLAR POWER INC224
Best Solar Power Inc208
BEST SOLAR POWER INC DBA BEST REMODELING AND DEVELOPMENT46
Best Solar Power Inc.8
Best Solar Power6
BEST SOLAR POWER, INC.5
BEST SOLAR POWER3
Best Solar Power inc2
Best solar Power Inc1
Best Solar Power, Inc1
Best Solar Power, Inc.1

Common questions

Where does Best Solar Power Inc install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (327 installs), followed by Orange County (69).

How often does Best Solar Power Inc install batteries with solar?

0.2% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Best Solar Power Inc installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 505 interconnected installs (0.8% of the 505 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.