Brothers Solar Electric

How many solar installs has Brothers Solar Electric done in California, and which license number is on its installs?

Brothers Solar Electric has 71 residential solar installs interconnected in California, active in the records from 2016 through 2017 (May 9, 2016 to May 26, 2017), most of them in Los Angeles County (32), Ventura County (14) and San Bernardino County (10). The license number recorded on most of its installs, 970843, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
71
Last 24 months
0
Total capacity
381.6 kW DC
Median system size
4.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 71 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 9, 2016
Latest install
May 26, 2017
Counties
7
Utilities
SCE 67, PGE 4
CSLB license
970843

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016510
2017200
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 71 interconnected installs with a tariff recorded (71) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06997.2%not counted
NEM 2.022.8%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Brothers Solar Electric’s installs. No residential system in the file lists a third-party owner name that matches Brothers Solar Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 71 of Brothers Solar Electric’s 71 installs name a module maker in the “Generator Manufacturer” fields, and most of those (51, 71.8%) used modules recorded as SolarWorld.

Across all years, 71 of Brothers Solar Electric’s 71 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (30, 42.3%) used inverters recorded as Fronius.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld051
SunPower013
Canadian Solar05
Qcells02
Inverter makerFronius030
SolarEdge027
SunPower012
Enphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 71 of 71 installs, inverters on 71. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970843Not found in the CSLB License Master file pulled Nov 4, 202670

License numbers are the ones the utilities recorded on the interconnection applications (71 of 71 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles32
Ventura14
San Bernardino10
Kern6
Orange5
Riverside3
Tulare1

Top cities

CityInstalls
Simi Valley14
Victorville5
Bakersfield3
Canyon Country3
Palmdale3
Bellflower2
Lancaster2
Moreno Valley2
Pomona2
Saugus2
South Pasadena2
Valencia2
Adelanto1
Apple Valley1
Arvin1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Brothers Solar Electric71

Common questions

Where does Brothers Solar Electric install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (32 installs), followed by Ventura County (14).

How often does Brothers Solar Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Brothers Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 71 interconnected installs with a tariff recorded (71) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.