Byers Enterprises, Inc.

How many solar installs has Byers Enterprises, Inc. done in California, and which license number is on its installs?

Byers Enterprises, Inc. has 344 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Apr 14, 2015 to Jan 13, 2026), most of them in Nevada County (206), Placer County (49) and El Dorado County (23). The license number recorded on most of its installs, 518784, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
344
Last 24 months
12
Total capacity
2,662 kW DC
Median system size
7.1 kW DC
With battery storage
6.1% all time; 75.0% last 24 months
Third-party owned
0.6% of 344 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Jan 13, 2026
Ownership types recorded
lease 2
Median battery size
29.2 kWh (2 installs list a capacity)
First install
Apr 14, 2015
Latest install
Jan 13, 2026
Counties
20
Utilities
PGE 344
CSLB license
518784

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201560
2016800
2017430
2018371
2019430
2020371
2021204
2022140
2023451
20241311
202552
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 344 interconnected installs (6.1% of the 344 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Jan 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08925.9%not counted
NEM 2.023468.0%6 (2.6%)
Net Billing Tariff216.1%14 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Byers Enterprises, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Byers Enterprises, Inc. exactly.

Third-party owner named on its installsInstalls
SunPower2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of Byers Enterprises, Inc.’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 91.7%) used modules recorded as REC.

In the last 24 months, 12 of Byers Enterprises, Inc.’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (11, 91.7%) used inverters recorded as Enphase.

In the last 24 months, 9 of Byers Enterprises, Inc.’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used batteries recorded as Enphase.

13 of 21 battery-paired PG&E and SCE installs (61.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1147
Aptos Solar11
LONGi1not in top list
Inverter makerEnphase1162
Sol-Ark1not in top list
Battery makerEnphase912

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 308 of 344 installs, inverters on 344. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Byers Enterprises, Inc. as developer on 1 battery storage project and as installer on 1 (0 name it as both), 2 projects in all with 34 kWh of storage. 1 have the status Paid, with $2,142 in current incentive allocations. Applications were received from Aug 12, 2020 to Apr 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid114$2,142
Cancelled119$19,412

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency119$19,4120$0
Small Residential Storage114$2,1421$2,142

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
518784Not found in the CSLB License Master file pulled Nov 4, 2026343

License numbers are the ones the utilities recorded on the interconnection applications (344 of 344 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Nevada206
Placer49
El Dorado23
Yolo10
Butte9
San Joaquin8
Contra Costa6
Sutter6
Yuba6
Solano5
Calaveras3
Colusa3
Plumas2
Stanislaus2
Alameda1
Lake1
Marin1
San Benito1
Santa Clara1
Sonoma1

Top cities

CityInstalls
Grass Valley120
Nevada City39
Penn Valley29
Auburn27
Placerville8
Lincoln7
Rocklin7
Rough And Ready6
Cameron Park5
Davis5
Smartsville5
Stockton5
Chico4
Yuba City4
Alta3

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BYERS ENTERPRISES INC146
Byers Enterprises, Inc.137
Byers Enterprises Inc34
Byers Enterprises, Inc16
Byers Enterprises Inc.7
Byers Enterprises3
Byers Enterprises. Inc1

Common questions

Where does Byers Enterprises, Inc. install solar?

Its installs are spread across 20 counties. The most are in Nevada County (206 installs), followed by Placer County (49).

How often does Byers Enterprises, Inc. install batteries with solar?

6.1% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (9 of 12).

How many Byers Enterprises, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 344 interconnected installs (6.1% of the 344 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.