California Solar Integrators Inc

How many solar installs has California Solar Integrators Inc done in California, and which license number is on its installs?

California Solar Integrators Inc has 48 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Apr 30, 2018 to Jul 1, 2026), most of them in San Diego County (19), Los Angeles County (11) and Riverside County (5). CSLB lists license 1004246 (CALIFORNIA SOLAR INTEGRATORS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
48
Last 24 months
11
Total capacity
1,269.2 kW DC
Median system size
10.2 kW DC
With battery storage
21.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 57.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 48 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Jul 1, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (6 installs list a capacity)
First install
Apr 30, 2018
Latest install
Jul 1, 2026
Counties
8
Utilities
SCE 23, SDGE 20, PGE 5
CSLB license
1004246

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201820
201920
2020100
202190
202271
202331
202451
202541
2026 (through Aug 31, 2026)62

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 48 interconnected installs (14.6% of the 48 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 42.9% of those include battery storage. The latest Net Billing Tariff install was approved Jul 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04185.4%3 (14.3%)
Net Billing Tariff714.6%3 (42.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on California Solar Integrators Inc’s installs. No residential system in the file lists a third-party owner name that matches California Solar Integrators Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of California Solar Integrators Inc’s 11 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 20.0%) used modules recorded as JA Solar.

In the last 24 months, 11 of California Solar Integrators Inc’s 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (5, 45.5%) used inverters recorded as Enphase.

In the last 24 months, 4 of California Solar Integrators Inc’s 11 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used batteries recorded as Enphase.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar2not in top list
Suzhou Talesun Solar Technologies2not in top list
Trina Solar25
Canadian Solar14
Phono Solar Technology13
Inverter makerEnphase59
APsystems (Altenergy Power System)46
SolarEdge231
Battery makerEnphase45

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 47 of 48 installs, inverters on 48. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names California Solar Integrators Inc as developer on 1 battery storage project and as installer on 2 (1 name it as both), 2 projects in all with 2,682 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Nov 10, 2021 to Nov 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled22,682$1,152,657

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage12,522$780,7910$0
Residential Solar and Storage Equity - AB 209 Non-POU1160$371,8660$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1004246CALIFORNIA SOLAR INTEGRATORS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJun 5, 2015Jun 30, 202748

License numbers are the ones the utilities recorded on the interconnection applications (48 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1004246. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list California Solar Integrators Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201920202021202220232026Total
City and County of San Francisco100424637463023
unincorporated San Diego County1004246028110223

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego19
Los Angeles11
Riverside5
Orange4
San Bernardino4
Santa Clara2
Yolo2
San Joaquin1

Top cities

CityInstalls
San Diego15
Davis2
Escondido2
San Bernardino2
San Jose2
Azusa1
Beverly Hills1
Capistrano Bch1
Cerritos1
Corona1
Culver City1
Encinitas1
Fontana1
Glendora1
Irvine1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALIFORNIA SOLAR INTEGRATORS INC28
California Solar Integrators Inc20

Common questions

Where does California Solar Integrators Inc install solar?

Its installs are spread across 8 counties. The most are in San Diego County (19 installs), followed by Los Angeles County (11).

How often does California Solar Integrators Inc install batteries with solar?

21.4% of its interconnected solar installs include battery storage across all years, and 57.1% in the last 24 months (4 of 7). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many California Solar Integrators Inc installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 48 interconnected installs (14.6% of the 48 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 42.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.