CALPRO SOLAR

How many solar installs has CALPRO SOLAR done in California, and which license number is on its installs?

CALPRO SOLAR has 130 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jul 2, 2019 to Apr 1, 2026), most of them in Contra Costa County (61), Alameda County (17) and Solano County (13). CSLB lists license 549715 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-39, C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
130
Last 24 months
13
Total capacity
917.6 kW DC
Median system size
6.6 kW DC
With battery storage
23.8% all time; 53.8% last 24 months
Third-party owned
0.0% of 130 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Jan 28, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (26 installs list a capacity)
First install
Jul 2, 2019
Latest install
Apr 1, 2026
Counties
13
Utilities
PGE 127, SCE 3
CSLB license
549715

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201970
2020365
2021427
2022156
2023102
202495
202584
2026 (through Aug 31, 2026)32

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 130 interconnected installs (8.5% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.9% of those include battery storage. The latest Net Billing Tariff install was approved Jan 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011991.5%21 (17.6%)
Net Billing Tariff118.5%10 (90.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CALPRO SOLAR’s installs. No residential system in the file lists a third-party owner name that matches CALPRO SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of CALPRO SOLAR’s 13 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 91.7%) used modules recorded as Qcells.

In the last 24 months, 13 of CALPRO SOLAR’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (6, 46.2%) used inverters recorded as PointGuard Energy Inc..

In the last 24 months, 6 of CALPRO SOLAR’s 13 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 83.3%) used batteries recorded as PointGuard Energy Inc..

25 of 31 battery-paired PG&E and SCE installs (80.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1150
Aptos Solar137
Inverter makerPointGuard Energy Inc.67
SolarEdge5119
Enphase13
Tesla11
Battery makerPointGuard Energy Inc.55
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 119 of 130 installs, inverters on 130. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
549715Sole owner license (name not shown)CLEARC-39 Roofing Contractor; C-46 Solar ContractorNov 30, 1988Feb 29, 2028123

License numbers are the ones the utilities recorded on the interconnection applications (130 of 130 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 549715. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Contra Costa61
Alameda17
Solano13
Santa Clara11
Napa9
Sonoma6
San Joaquin5
Marin2
San Bernardino2
Butte1
Orange1
Sutter1
Yolo1

Top cities

CityInstalls
Brentwood11
Walnut Creek9
Antioch8
Berkeley8
Oakley7
Napa6
Concord5
San Jose5
Lafayette4
Santa Rosa4
Suisun City4
Fairfield3
Martinez3
San Pablo3
Tracy3

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALPRO SOLAR123
CalPro Solar5
Calpro Solar2

Common questions

Where does CALPRO SOLAR install solar?

Its installs are spread across 13 counties. The most are in Contra Costa County (61 installs), followed by Alameda County (17).

How often does CALPRO SOLAR install batteries with solar?

23.8% of its interconnected solar installs include battery storage across all years, and 53.8% in the last 24 months (7 of 13).

How many CALPRO SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 130 interconnected installs (8.5% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.