CALSTATE ENERGY INC

How many solar installs has CALSTATE ENERGY INC done in California, and which license number is on its installs?

CALSTATE ENERGY INC has 49 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jun 1, 2020 to Jun 25, 2026), most of them in Los Angeles County (28), Orange County (12) and San Bernardino County (3). CSLB lists license 1039291 (CALSTATE ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
49
Last 24 months
15
Total capacity
387.5 kW DC
Median system size
7.4 kW DC
With battery storage
12.2% all time; 33.3% last 24 months
Third-party owned
0.0% of 49 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Jun 25, 2026
Ownership types recorded
none recorded
Median battery size
14.5 kWh (6 installs list a capacity)
First install
Jun 1, 2020
Latest install
Jun 25, 2026
Counties
9
Utilities
SCE 44, PGE 5
CSLB license
1039291

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
202130
2022121
2023130
202471
2025114
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 49 interconnected installs (42.9% of the 49 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 19.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02857.1%2 (7.1%)
Net Billing Tariff2142.9%4 (19.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CALSTATE ENERGY INC’s installs. No residential system in the file lists a third-party owner name that matches CALSTATE ENERGY INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of CALSTATE ENERGY INC’s 15 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 40.0%) used modules recorded as Solar4America Technology Inc..

In the last 24 months, 15 of CALSTATE ENERGY INC’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 86.7%) used inverters recorded as Enphase.

In the last 24 months, 3 of CALSTATE ENERGY INC’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as FranklinWH.

4 of 6 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolar4America Technology Inc.66
G-Star2not in top list
Renon Power Technology Inc2not in top list
Solar 4 America2not in top list
ANDALAY MODULES1not in top list
Inverter makerEnphase1327
Sol-Ark22
SMA1not in top list
Battery makerFranklinWH22
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 48 of 49 installs, inverters on 49. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1039291CALSTATE ENERGY INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMay 11, 2018May 31, 202849

License numbers are the ones the utilities recorded on the interconnection applications (49 of 49 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1039291. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles28
Orange12
San Bernardino3
Alameda1
Fresno1
Riverside1
San Joaquin1
Santa Clara1
Sutter1

Top cities

CityInstalls
Rancho Palos Verdes5
Arcadia4
Beverly Hills3
Irvine3
Lake Forest3
Calabasas2
Redondo Beach2
Santa Ana2
Torrance2
Alhambra1
Alta Loma1
El Segundo1
Fresno1
Hayward1
Hermosa Beach1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALSTATE ENERGY INC49

Common questions

Where does CALSTATE ENERGY INC install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (28 installs), followed by Orange County (12).

How often does CALSTATE ENERGY INC install batteries with solar?

12.2% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (5 of 15).

How many CALSTATE ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 49 interconnected installs (42.9% of the 49 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 19.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.