CAPTIVE SOLAR ENERGY INC

How many solar installs has CAPTIVE SOLAR ENERGY INC done in California, and which license number is on its installs?

CAPTIVE SOLAR ENERGY INC has 372 residential solar installs interconnected in California, active in the records from 2020 through 2023 (Nov 23, 2020 to Jun 29, 2023), most of them in Butte County (224), Tehama County (45) and Sutter County (32). CSLB lists license 1069206 (OHM SOLAR SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
372
Last 24 months
0
Total capacity
2,903.1 kW DC
Median system size
7.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 372 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Nov 23, 2020
Latest install
Jun 29, 2023
Counties
15
Utilities
PGE 372
CSLB license
1069206

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202050
20211330
20222310
202330
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 372 interconnected installs with a tariff recorded (372) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.3%not counted
NEM 2.037199.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CAPTIVE SOLAR ENERGY INC’s installs. No residential system in the file lists a third-party owner name that matches CAPTIVE SOLAR ENERGY INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 347 of CAPTIVE SOLAR ENERGY INC’s 372 installs name a module maker in the “Generator Manufacturer” fields, and most of those (201, 57.9%) used modules recorded as Qcells.

Across all years, 372 of CAPTIVE SOLAR ENERGY INC’s 372 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (369, 99.2%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells0201
CertainTeed0102
JinkoSolar019
Canadian Solar016
REC04
Inverter makerEnphase0369
SolarEdge06
SMA03
Fronius02
Power-One02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 347 of 372 installs, inverters on 372. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1069206OHM SOLAR SOLUTIONS (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorSep 25, 2020Sep 30, 2028372

License numbers are the ones the utilities recorded on the interconnection applications (372 of 372 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1069206. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte224
Tehama45
Sutter32
Shasta30
Glenn18
Yuba6
Colusa5
Placer3
Contra Costa2
Plumas2
Alameda1
Lake1
Nevada1
San Joaquin1
Solano1

Top cities

CityInstalls
Chico154
Paradise41
Red Bluff26
Yuba City23
Anderson17
Oroville17
Orland13
Corning8
Los Molinos7
Redding7
Cottonwood6
Live Oak5
Magalia5
Gridley4
Marysville4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CAPTIVE SOLAR ENERGY INC371
CAPTIVE SOLAR ENERGY INC DBA OHM SOLAR SOLUTIONS1

Common questions

Where does CAPTIVE SOLAR ENERGY INC install solar?

Its installs are spread across 15 counties. The most are in Butte County (224 installs), followed by Tehama County (45).

How often does CAPTIVE SOLAR ENERGY INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many CAPTIVE SOLAR ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 372 interconnected installs with a tariff recorded (372) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.