CINRAN ELECTRICAL SOLUTIONS INC

How many solar installs has CINRAN ELECTRICAL SOLUTIONS INC done in California, and which license number is on its installs?

CINRAN ELECTRICAL SOLUTIONS INC has 47 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jan 13, 2018 to Aug 28, 2026), most of them in San Bernardino County (34), Los Angeles County (9) and Orange County (3). CSLB lists license 1020538 (CINRAN ELECTRICAL SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
47
Last 24 months
25
Total capacity
480.4 kW DC
Median system size
9.7 kW DC
With battery storage
66.0% all time; 100.0% last 24 months
Third-party owned
17.0% of 47 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
26 installs, latest Aug 28, 2026
Ownership types recorded
PPA 8
Median battery size
18.5 kWh (31 installs list a capacity)
First install
Jan 13, 2018
Latest install
Aug 28, 2026
Counties
4
Utilities
SCE 47
CSLB license
1020538

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
201920
202020
202152
202251
202322
202451
20251616
2026 (through Aug 31, 2026)99

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

26 of its 47 interconnected installs (55.3% of the 47 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02144.7%7 (33.3%)
Net Billing Tariff2655.3%24 (92.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 8 of CINRAN ELECTRICAL SOLUTIONS INC’s installs the utility recorded a third-party ownership type: PPA 8, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches CINRAN ELECTRICAL SOLUTIONS INC exactly.

Third-party owner named on its installsInstalls
Lightreach8

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 25 of CINRAN ELECTRICAL SOLUTIONS INC’s 25 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 24.0%) used modules recorded as Hyundai.

In the last 24 months, 25 of CINRAN ELECTRICAL SOLUTIONS INC’s 25 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 96.0%) used inverters recorded as Tesla.

In the last 24 months, 25 of CINRAN ELECTRICAL SOLUTIONS INC’s 25 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (24, 96.0%) used batteries recorded as Tesla.

25 of 31 battery-paired PG&E and SCE installs (80.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai66
LONGi66
JA Solar55
Sinotec USA3not in top list
JinkoSolar2not in top list
Inverter makerTesla2424
Enphase111
Battery makerTesla2424
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 46 of 47 installs, inverters on 47. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CINRAN ELECTRICAL SOLUTIONS INC as developer on 15 battery storage projects and as installer on 17 (14 name it as both), 18 projects in all with 918 kWh of storage. 9 have the status Paid, with $342,524 in current incentive allocations. Applications were received from Jun 15, 2020 to Jul 15, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid9412$342,524
Reserved256$10,665
Cancelled7450$381,209

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency10697$685,1256$326,961
Large-Scale Storage5159$37,7841$8,894
Small Residential Storage363$11,4892$6,669

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1020538CINRAN ELECTRICAL SOLUTIONS INC (Corporation)CLEARC-10 Electrical ContractorNov 8, 2016Feb 28, 202747

License numbers are the ones the utilities recorded on the interconnection applications (47 of 47 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1020538. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino34
Los Angeles9
Orange3
Riverside1

Top cities

CityInstalls
Apple Valley11
Hesperia4
Victorville4
Loma Linda3
Fontana2
Helendale2
Lancaster2
San Bernardino2
Arcadia1
Barstow1
Cerritos1
Chino1
Garden Grove1
Glendora1
Irvine1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CINRAN ELECTRICAL SOLUTIONS INC31
CINRAN ELECTRICAL SOLUTIONS16

Common questions

Where does CINRAN ELECTRICAL SOLUTIONS INC install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (34 installs), followed by Los Angeles County (9).

How often does CINRAN ELECTRICAL SOLUTIONS INC install batteries with solar?

66.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (25 of 25).

How many CINRAN ELECTRICAL SOLUTIONS INC installs are under NEM 3.0 (the Net Billing Tariff)?

26 of its 47 interconnected installs (55.3% of the 47 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.