CleanFactor Energy Inc

How many solar installs has CleanFactor Energy Inc done in California, and which license number is on its installs?

CleanFactor Energy Inc has 75 residential solar installs interconnected in California, active in the records from 2016 through 2020 (May 26, 2016 to Sep 1, 2020), most of them in Marin County (17), San Francisco County (12) and Santa Clara County (12). The license number recorded on most of its installs, 965327, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
75
Last 24 months
0
Total capacity
461.4 kW DC
Median system size
5.9 kW DC
With battery storage
2.7% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 75 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 26, 2016
Latest install
Sep 1, 2020
Counties
11
Utilities
PGE 75
CSLB license
965327

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201660
2017240
2018161
2019110
2020181
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 75 interconnected installs with a tariff recorded (75) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.068.0%not counted
NEM 2.06992.0%2 (2.9%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CleanFactor Energy Inc’s installs. No residential system in the file lists a third-party owner name that matches CleanFactor Energy Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 73 of CleanFactor Energy Inc’s 75 installs name a module maker in the “Generator Manufacturer” fields, and most of those (57, 78.1%) used modules recorded as LG.

Across all years, 75 of CleanFactor Energy Inc’s 75 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (43, 57.3%) used inverters recorded as SolarEdge.

Across all years, 1 of CleanFactor Energy Inc’s 75 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 2 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG057
Qcells06
Canadian Solar05
Panasonic02
SolarWorld02
Inverter makerSolarEdge043
Enphase027
Fronius04
LG01
Magnetek01
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 73 of 75 installs, inverters on 75. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CleanFactor Energy Inc as developer on 3 battery storage projects and as installer on 3 (3 name it as both), 3 projects in all with 30 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jul 27, 2018 to Jun 30, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled330$17,550

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage217$4,6090$0
Equity Resiliency113$12,9410$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
965327Not found in the CSLB License Master file pulled Nov 4, 202675

License numbers are the ones the utilities recorded on the interconnection applications (75 of 75 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list CleanFactor Energy Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020Total
City and County of San Francisco965327033
unincorporated Marin County965327112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Marin17
San Francisco12
Santa Clara12
Alameda9
San Joaquin6
San Mateo6
Sonoma5
Contra Costa4
Solano2
Napa1
Yolo1

Top cities

CityInstalls
San Francisco12
San Jose10
San Rafael8
Manteca5
Fremont3
Livermore3
Santa Rosa3
Mill Valley2
Novato2
Redwood City2
Rohnert Park2
Tiburon2
Daly City1
Danville1
Davis1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CleanFactor Energy Inc32
CleanFactor Energy24
CLEANFACTOR ENERGY INC18
CleanFactor Energy INc1

Common questions

Where does CleanFactor Energy Inc install solar?

Its installs are spread across 11 counties. The most are in Marin County (17 installs), followed by San Francisco County (12).

How often does CleanFactor Energy Inc install batteries with solar?

2.7% of its interconnected solar installs include battery storage across all years.

How many CleanFactor Energy Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 75 interconnected installs with a tariff recorded (75) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.