CLIMATE SOLUTIONS

How many solar installs has CLIMATE SOLUTIONS done in California, and which license number is on its installs?

CLIMATE SOLUTIONS has 331 residential solar installs interconnected in California, active in the records from 2019 through 2024 (Oct 29, 2019 to Jul 30, 2024), most of them in Butte County (295), Tehama County (15) and Glenn County (11). CSLB lists license 807511 (FEATHER RIVER AIRE AND SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
331
Last 24 months
0
Total capacity
2,763.3 kW DC
Median system size
7.5 kW DC
With battery storage
3.9% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 331 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Oct 29, 2019
Latest install
Jul 30, 2024
Counties
9
Utilities
PGE 331
CSLB license
807511

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019430
2020861
20211091
20228810
202331
202420
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 331 interconnected installs with a tariff recorded (331) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0331100.0%13 (3.9%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CLIMATE SOLUTIONS’s installs. No residential system in the file lists a third-party owner name that matches CLIMATE SOLUTIONS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 309 of CLIMATE SOLUTIONS’ 331 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (102, 33.0%) used modules recorded as Qcells.

Across all years, 331 of CLIMATE SOLUTIONS’ 331 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (328, 99.1%) used inverters recorded as Enphase.

Across all years, 6 of CLIMATE SOLUTIONS’ 331 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used batteries recorded as Enphase.

6 of 13 battery-paired PG&E and SCE installs (46.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells0102
REC0101
JinkoSolar069
Canadian Solar030
LG05
Inverter makerEnphase0328
Tesla08
SolarEdge04
Fronius02
SMA02
Battery makerEnphase04
Tesla02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 309 of 331 installs, inverters on 331. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
807511FEATHER RIVER AIRE AND SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorMay 2, 2002Apr 30, 2027331

License numbers are the ones the utilities recorded on the interconnection applications (331 of 331 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 807511. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte295
Tehama15
Glenn11
Sutter3
Shasta2
Yuba2
Colusa1
Placer1
Plumas1

Top cities

CityInstalls
Chico233
Oroville24
Paradise23
Corning9
Orland7
Durham4
Gridley3
Red Bluff3
Willows3
Yuba City3
Los Molinos2
Palermo2
Anderson1
Berry Creek1
Biggs1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CLIMATE SOLUTIONS325
Climate Solutions6

Common questions

Where does CLIMATE SOLUTIONS install solar?

Its installs are spread across 9 counties. The most are in Butte County (295 installs), followed by Tehama County (15).

How often does CLIMATE SOLUTIONS install batteries with solar?

3.9% of its interconnected solar installs include battery storage across all years.

How many CLIMATE SOLUTIONS installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 331 interconnected installs with a tariff recorded (331) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.