CM Construction

How many solar installs has CM Construction done in California, and which license number is on its installs?

CM Construction has 55 residential solar installs interconnected in California, active in the records from 2014 through 2019 (Aug 15, 2014 to Sep 11, 2019), most of them in Butte County (13), Lake County (11) and Humboldt County (9). CSLB lists license 905253 (MOREY COLLIN CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
55
Last 24 months
0
Total capacity
357.4 kW DC
Median system size
5.8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 55 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 15, 2014
Latest install
Sep 11, 2019
Counties
15
Utilities
PGE 54, SCE 1
CSLB license
905253

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201540
2016100
2017170
2018180
201950
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 55 interconnected installs with a tariff recorded (55) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01527.3%not counted
NEM 2.04072.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CM Construction’s installs. No residential system in the file lists a third-party owner name that matches CM Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 54 of CM Construction’s 55 installs name a module maker in the “Generator Manufacturer” fields, and most of those (41, 75.9%) used modules recorded as SolarWorld.

Across all years, 55 of CM Construction’s 55 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 76.4%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld041
Canadian Solar03
REC03
Mission Solar02
Qcells02
Inverter makerSolarEdge042
Enphase012
Fronius01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 55 installs, inverters on 55. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
905253MOREY COLLIN CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorOct 19, 2007Sep 30, 202754

License numbers are the ones the utilities recorded on the interconnection applications (55 of 55 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 905253. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list CM Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
City and County of San Francisco90525311

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Butte13
Lake11
Humboldt9
Mendocino6
El Dorado2
Placer2
Plumas2
Sutter2
Tuolumne2
Lassen1
Mariposa1
Nevada1
Orange1
Shasta1
Tehama1

Top cities

CityInstalls
Oroville8
Kelseyville4
Eureka3
Clearlake2
Gridley2
Live Oak2
Middletown2
Rescue2
Anderson1
Auburn1
Biggs1
Blue Lake1
Boonville1
Branscomb1
Chico1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CM Construction54
CM construction1

Common questions

Where does CM Construction install solar?

Its installs are spread across 15 counties. The most are in Butte County (13 installs), followed by Lake County (11).

How often does CM Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many CM Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 55 interconnected installs with a tariff recorded (55) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.