CONNECT SOLAR

How many solar installs has CONNECT SOLAR done in California, and which license number is on its installs?

CONNECT SOLAR has 107 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Aug 6, 2014 to Aug 31, 2026), most of them in Kern County (93), Tulare County (5) and Riverside County (3). CSLB lists license 1093207 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
107
Last 24 months
43
Total capacity
897.6 kW DC
Median system size
8.1 kW DC
With battery storage
37.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 81.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
22.1% of 104 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
36 installs, latest Aug 31, 2026
Ownership types recorded
PPA 23
Median battery size
4.4 kWh (4 installs list a capacity)
First install
Aug 6, 2014
Latest install
Aug 31, 2026
Counties
8
Utilities
PGE 71, SCE 35, SDGE 1
CSLB license
1093207

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201430
201500
201600
201710
201800
201900
202000
202100
202280
2023420
2024178
20252220
2026 (through Aug 31, 2026)1412

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

36 of its 107 interconnected installs (33.6% of the 107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.043.7%not counted
NEM 2.06762.6%14 (21.2%)
Net Billing Tariff3633.6%26 (72.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 23 of CONNECT SOLAR’s installs the utility recorded a third-party ownership type: PPA 23, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches CONNECT SOLAR exactly.

Third-party owner named on its installsInstalls
Rock Canyon Builders23

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 43 of CONNECT SOLAR’s 43 installs name a module maker in the “Generator Manufacturer” fields, and most of those (25, 58.1%) used modules recorded as Mission Solar.

In the last 24 months, 43 of CONNECT SOLAR’s 43 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (43, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 35 of CONNECT SOLAR’s 43 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (34, 97.1%) used batteries recorded as Enphase.

40 of 40 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar2525
Znshine811
Axitec410
Hyperion Solar4not in top list
Hyundai1not in top list
Inverter makerEnphase4398
Tesla11
Battery makerEnphase3439
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 104 of 107 installs, inverters on 107. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1093207Sole owner license (name not shown)CLEARC-10 Electrical ContractorJun 25, 2022Jun 30, 2028103

License numbers are the ones the utilities recorded on the interconnection applications (103 of 107 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1093207. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern93
Tulare5
Riverside3
Los Angeles2
Fresno1
Kings1
San Bernardino1
San Diego1

Top cities

CityInstalls
Bakersfield44
Shafter24
Ridgecrest8
Tehachapi5
Visalia4
Lake Isabella3
Keene2
Bodfish1
Caliente1
Canyon Lake1
Delano1
Exeter1
Fresno1
Hanford1
Lake Elsinore1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CONNECT SOLAR97
Connect Solar10

Common questions

Where does CONNECT SOLAR install solar?

Its installs are spread across 8 counties. The most are in Kern County (93 installs), followed by Tulare County (5).

How often does CONNECT SOLAR install batteries with solar?

37.7% of its interconnected solar installs include battery storage across all years, and 81.4% in the last 24 months (35 of 43). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many CONNECT SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

36 of its 107 interconnected installs (33.6% of the 107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.