Daylight Solar Energy

How many solar installs has Daylight Solar Energy done in California, and which license number is on its installs?

Daylight Solar Energy has 320 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jan 28, 2016 to Aug 31, 2026), most of them in San Bernardino County (257), Riverside County (35) and Los Angeles County (23). CSLB lists license 903293 (DAYLIGHT SOLAR ENERGY CORP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
320
Last 24 months
63
Total capacity
2,253.6 kW DC
Median system size
6 kW DC
With battery storage
11.3% all time; 52.4% last 24 months
Third-party owned
0.0% of 320 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
102 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (36 installs list a capacity)
First install
Jan 28, 2016
Latest install
Aug 31, 2026
Counties
4
Utilities
SCE 320
CSLB license
903293

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016200
2017500
2018230
2019170
2020120
2021140
2022381
2023490
2024477
20253122
2026 (through Aug 31, 2026)196

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

102 of its 320 interconnected installs (31.9% of the 320 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 34.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05216.3%not counted
NEM 2.016651.9%1 (0.6%)
Net Billing Tariff10231.9%35 (34.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Daylight Solar Energy’s installs. No residential system in the file lists a third-party owner name that matches Daylight Solar Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 63 of Daylight Solar Energy’s 63 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 23.8%) used modules recorded as Bluesun Solar.

In the last 24 months, 63 of Daylight Solar Energy’s 63 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (61, 96.8%) used inverters recorded as Enphase.

In the last 24 months, 33 of Daylight Solar Energy’s 63 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (19, 57.6%) used batteries recorded as Enphase.

35 of 36 battery-paired PG&E and SCE installs (97.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerBluesun Solar15not in top list
Hyperion Solar10not in top list
JA Solar9not in top list
LONGi9not in top list
Hyundai518
Inverter makerEnphase61130
SolarEdge1169
Tesla14
Battery makerEnphase1919
FranklinWH1214
Frankli WH11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 316 of 320 installs, inverters on 320. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
903293DAYLIGHT SOLAR ENERGY CORP (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorSep 11, 2007Dec 31, 2027320

License numbers are the ones the utilities recorded on the interconnection applications (320 of 320 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 903293. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino257
Riverside35
Los Angeles23
Orange5

Top cities

CityInstalls
Fontana132
San Bernardino29
Rialto22
Bloomington20
Rancho Cucamonga18
Corona5
Long Beach5
Moreno Valley5
Ontario5
Perris5
Victorville5
Hemet4
Hesperia4
San Jacinto4
Upland4

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DAYLIGHT SOLAR ENERGY CORP181
Daylight Solar Energy72
Daylight Solar Energy Corp58
DAYLIGHT SOLAR ENERGY3
daylight solar energy2
daylight Solar Energy1
Daylight solar Energy1
daylight solar energy corp1
Daylight Solar Energy corp1

Common questions

Where does Daylight Solar Energy install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (257 installs), followed by Riverside County (35).

How often does Daylight Solar Energy install batteries with solar?

11.3% of its interconnected solar installs include battery storage across all years, and 52.4% in the last 24 months (33 of 63).

How many Daylight Solar Energy installs are under NEM 3.0 (the Net Billing Tariff)?

102 of its 320 interconnected installs (31.9% of the 320 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 34.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.