DC Solar Electric Inc

How many solar installs has DC Solar Electric Inc done in California, and which license number is on its installs?

DC Solar Electric Inc has 308 residential solar installs interconnected in California, active in the records from 2010 through 2025 (Dec 20, 2010 to Jul 29, 2025), most of them in Nevada County (148), Placer County (91) and Sutter County (32). CSLB lists license 953430 (D C SOLAR ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
308
Last 24 months
5
Total capacity
2,352 kW DC
Median system size
7.1 kW DC
With battery storage
0.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 20.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 307 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest May 2, 2025
Ownership types recorded
none recorded
First install
Dec 20, 2010
Latest install
Jul 29, 2025
Counties
16
Utilities
PGE 307, SDGE 1
CSLB license
953430

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201140
2012160
2013200
2014460
2015550
2016300
2017470
2018460
2019300
202000
202110
202200
202340
202441
202541
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 308 interconnected installs (0.6% of the 308 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved May 2, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.017356.2%not counted
NEM 2.013343.2%0 (0.0%)
Net Billing Tariff20.6%2 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on DC Solar Electric Inc’s installs. No residential system in the file lists a third-party owner name that matches DC Solar Electric Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of DC Solar Electric Inc’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used modules recorded as Qcells.

In the last 24 months, 5 of DC Solar Electric Inc’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 80.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of DC Solar Electric Inc’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells436
Trina Solar1not in top list
Inverter makerEnphase4281
Sol-Ark1not in top list
Battery makerEnphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 305 of 308 installs, inverters on 308. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names DC Solar Electric Inc as developer on 7 battery storage projects and as installer on 8 (7 name it as both), 8 projects in all with 436 kWh of storage. 5 have the status Paid, with $28,083 in current incentive allocations. Applications were received from Sep 25, 2020 to Mar 26, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid563$28,083
PBI in Process1354$235,514
Cancelled219$3,882

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage563$12,5533$8,671
Equity Resiliency3373$254,9262$19,412

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
953430D C SOLAR ELECTRIC INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorOct 13, 2010Oct 31, 2028258

License numbers are the ones the utilities recorded on the interconnection applications (258 of 308 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 953430. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list DC Solar Electric Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232024Total
City and County of San Francisco953430213

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Nevada148
Placer91
Sutter32
Yuba12
Yolo5
Contra Costa3
El Dorado3
Shasta3
Butte2
Colusa2
Glenn2
Lake1
Napa1
San Diego1
San Joaquin1
Sonoma1

Top cities

CityInstalls
Penn Valley74
Grass Valley46
Lincoln46
Yuba City29
Nevada City21
Rocklin16
Auburn9
Granite Bay9
Smartsville6
Loomis5
Marysville5
Newcastle5
Browns Valley4
Clarksburg3
Cottonwood3

Names as recorded by the utilities

The utilities recorded this installer under 12 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DC Solar Electric Inc128
DC Solar Electric, Inc.83
DC Solar Electric Inc.29
DC SOLAR ELECTRIC INC19
DC Solar Electric, Inc16
DC SOLAR ELECTRIC INC.11
DC Solar Electric8
DC Solar Electric inc6
DC SOlar Electric Inc5
DC Solar Electric,Inc1
DC Solar Electric,Inc.1
DC Solar Electric.inc1

Common questions

Where does DC Solar Electric Inc install solar?

Its installs are spread across 16 counties. The most are in Nevada County (148 installs), followed by Placer County (91).

How often does DC Solar Electric Inc install batteries with solar?

0.7% of its interconnected solar installs include battery storage across all years, and 20.0% in the last 24 months (1 of 5). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many DC Solar Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 308 interconnected installs (0.6% of the 308 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.