DURA - FOAM INC

How many solar installs has DURA - FOAM INC done in California, and which license number is on its installs?

DURA - FOAM INC has 75 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Nov 8, 2010 to Aug 25, 2026), most of them in Santa Clara County (43), San Mateo County (22) and Alameda County (7). CSLB lists license 435836 (DURA - FOAM INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, D-12, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
75
Last 24 months
40
Total capacity
488.3 kW DC
Median system size
6 kW DC
With battery storage
48.0% all time; 82.5% last 24 months
Third-party owned
0.0% of 75 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
43 installs, latest Aug 25, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (10 installs list a capacity)
First install
Nov 8, 2010
Latest install
Aug 25, 2026
Counties
6
Utilities
PGE 75
CSLB license
435836

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201100
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202280
202392
2024181
20251311
2026 (through Aug 31, 2026)2622

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

43 of its 75 interconnected installs (57.3% of the 75 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.3%not counted
NEM 2.03141.3%2 (6.5%)
Net Billing Tariff4357.3%34 (79.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on DURA - FOAM INC’s installs. No residential system in the file lists a third-party owner name that matches DURA - FOAM INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 40 of DURA - FOAM INC’s 40 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 37.5%) used modules recorded as Qcells.

In the last 24 months, 40 of DURA - FOAM INC’s 40 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (29, 72.5%) used inverters recorded as Enphase.

In the last 24 months, 32 of DURA - FOAM INC’s 40 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (15, 46.9%) used batteries recorded as Tesla.

33 of 36 battery-paired PG&E and SCE installs (91.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1534
JA Solar99
Sonali Energees USA LLC99
Hyundai77
SunPower2not in top list
Inverter makerEnphase2929
Tesla1515
FranklinWH1313
SolarEdge842
SunPower2not in top list
Battery makerTesla1515
FranklinWH1313
Enphase33
SolarEdge13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 70 of 75 installs, inverters on 75. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
435836DURA - FOAM INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; D-12Feb 28, 1983Jul 31, 202874

License numbers are the ones the utilities recorded on the interconnection applications (74 of 75 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 435836. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list DURA - FOAM INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2025Total
City and County of San Francisco43583622

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara43
San Mateo22
Alameda7
Contra Costa1
San Francisco1
San Joaquin1

Top cities

CityInstalls
Sunnyvale16
San Jose10
San Mateo10
Mountain View7
Redwood City6
Cupertino5
Castro Valley3
Fremont2
Los Altos2
Stanford2
Belmont1
Burlingame1
Foster City1
Lodi1
Menlo Park1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DURA - FOAM INC74
Dura-Foam Inc1

Common questions

Where does DURA - FOAM INC install solar?

Its installs are spread across 6 counties. The most are in Santa Clara County (43 installs), followed by San Mateo County (22).

How often does DURA - FOAM INC install batteries with solar?

48.0% of its interconnected solar installs include battery storage across all years, and 82.5% in the last 24 months (33 of 40).

How many DURA - FOAM INC installs are under NEM 3.0 (the Net Billing Tariff)?

43 of its 75 interconnected installs (57.3% of the 75 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.