ECO PLANET BUILDERS INC

How many solar installs has ECO PLANET BUILDERS INC done in California, and which license number is on its installs?

ECO PLANET BUILDERS INC has 218 residential solar installs interconnected in California, active in the records from 2020 through 2024 (Nov 10, 2020 to Mar 7, 2024), most of them in Los Angeles County (125), Orange County (30) and Ventura County (25). The license number recorded on most of its installs, 1031107, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
218
Last 24 months
0
Total capacity
1,773.8 kW DC
Median system size
5.8 kW DC
With battery storage
0.9% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 218 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Mar 7, 2024
Ownership types recorded
none recorded
Median battery size
6.6 kWh (2 installs list a capacity)
First install
Nov 10, 2020
Latest install
Mar 7, 2024
Counties
8
Utilities
SCE 215, PGE 3
CSLB license
1031107

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020140
2021892
2022720
2023420
202410
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 218 interconnected installs (0.9% of the 218 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 7, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.021699.1%2 (0.9%)
Net Billing Tariff20.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ECO PLANET BUILDERS INC’s installs. No residential system in the file lists a third-party owner name that matches ECO PLANET BUILDERS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 212 of ECO PLANET BUILDERS INC’s 218 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (54, 25.5%) used modules recorded as Aptos Solar.

Across all years, 218 of ECO PLANET BUILDERS INC’s 218 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (100, 45.9%) used inverters recorded as SolarEdge.

Across all years, 2 of ECO PLANET BUILDERS INC’s 218 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar054
SunPower044
LG036
Mission Solar017
Panasonic016
Inverter makerSolarEdge0100
Enphase070
SunPower030
Tesla07
Delta Electronics04
Battery makerEnphase01
LG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 212 of 218 installs, inverters on 218. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1031107Not found in the CSLB License Master file pulled Nov 4, 2026218

License numbers are the ones the utilities recorded on the interconnection applications (218 of 218 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles125
Orange30
Ventura25
San Bernardino24
Riverside7
Kern3
Santa Barbara3
Alameda1

Top cities

CityInstalls
Palmdale9
Santa Ana7
Fullerton5
Lancaster5
Santa Monica5
Simi Valley5
Valencia5
Beverly Hills4
Camarillo4
Fontana4
Garden Grove4
La Puente4
Norwalk4
Pomona4
Rancho Palos Verdes4

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ECO PLANET BUILDERS INC218

Common questions

Where does ECO PLANET BUILDERS INC install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (125 installs), followed by Orange County (30).

How often does ECO PLANET BUILDERS INC install batteries with solar?

0.9% of its interconnected solar installs include battery storage across all years.

How many ECO PLANET BUILDERS INC installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 218 interconnected installs (0.9% of the 218 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.