Element Electric Inc

How many solar installs has Element Electric Inc done in California, and which license number is on its installs?

Element Electric Inc has 256 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Apr 8, 2013 to Aug 7, 2026), most of them in Solano County (161), Yolo County (42) and Napa County (16). CSLB lists license 871218 (ELEMENT ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
256
Last 24 months
27
Total capacity
1,873.6 kW DC
Median system size
6.9 kW DC
With battery storage
14.8% all time; 70.4% last 24 months
Third-party owned
0.4% of 256 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
25 installs, latest Aug 7, 2026
Ownership types recorded
PPA 1
Median battery size
20.5 kWh (4 installs list a capacity)
First install
Apr 8, 2013
Latest install
Aug 7, 2026
Counties
13
Utilities
PGE 256
CSLB license
871218

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201360
2014120
2015130
2016140
2017150
2018110
2019150
2020221
2021292
2022336
2023454
2024188
2025159
2026 (through Aug 31, 2026)88

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

25 of its 256 interconnected installs (9.8% of the 256 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04618.0%not counted
NEM 2.018572.3%13 (7.0%)
Net Billing Tariff259.8%24 (96.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Element Electric Inc’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Element Electric Inc exactly.

Third-party owner named on its installsInstalls
SolSource DevCo LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 25 of Element Electric Inc’s 27 installs name a module maker in the “Generator Manufacturer” fields, and most of those (15, 60.0%) used modules recorded as REC.

In the last 24 months, 27 of Element Electric Inc’s 27 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (23, 85.2%) used inverters recorded as Enphase.

In the last 24 months, 17 of Element Electric Inc’s 27 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (14, 82.4%) used batteries recorded as Enphase.

34 of 38 battery-paired PG&E and SCE installs (89.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1588
Hyundai5not in top list
JA Solar2not in top list
Qcells27
BP Solar1not in top list
Inverter makerEnphase23249
Tesla45
SMA24
ABB11
Xantrex Technology Inc.1not in top list
Battery makerEnphase1430
Tesla34

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 247 of 256 installs, inverters on 255. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Element Electric Inc as developer on 9 battery storage projects and as installer on 9 (9 name it as both), 9 projects in all with 166 kWh of storage. 5 have the status Paid, with $25,494 in current incentive allocations. Applications were received from Nov 29, 2020 to Jun 6, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid5120$25,494
Reserved113$24,558
Cancelled333$16,597

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage571$12,7793$9,382
Large-Scale Storage268$16,1122$16,112
Equity Resiliency113$13,2000$0
Residential Solar and Storage Equity - AB 209 Non-POU113$24,5580$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
871218ELEMENT ELECTRIC INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJan 20, 2006Jan 31, 2028247

License numbers are the ones the utilities recorded on the interconnection applications (247 of 256 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 871218. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Solano161
Yolo42
Napa16
Contra Costa14
Alameda6
Lake4
Placer4
Marin3
Yuba2
San Joaquin1
San Mateo1
Shasta1
Tehama1

Top cities

CityInstalls
Vacaville80
Dixon56
Davis27
Fairfield16
Napa11
Winters8
Concord6
Suisun City6
American Canyon3
Clearlake Oaks3
Danville3
San Rafael3
Castro Valley2
Oakland2
Rocklin2

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELEMENT ELECTRIC INC181
Element Electric Inc51
Element Electric Inc.14
Element Electric inc4
Element Electric2
element electric inc1
element Electric Inc1
Element electric Inc1
ELEMENT ELECTRIC INC.1

Common questions

Where does Element Electric Inc install solar?

Its installs are spread across 13 counties. The most are in Solano County (161 installs), followed by Yolo County (42).

How often does Element Electric Inc install batteries with solar?

14.8% of its interconnected solar installs include battery storage across all years, and 70.4% in the last 24 months (19 of 27).

How many Element Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?

25 of its 256 interconnected installs (9.8% of the 256 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.