ELITE HOME REMODELING INC

How many solar installs has ELITE HOME REMODELING INC done in California, and which license number is on its installs?

ELITE HOME REMODELING INC has 55 residential solar installs interconnected in California, active in the records from 2022 through 2024 (Aug 19, 2022 to Sep 18, 2024), most of them in Los Angeles County (34), Orange County (5) and Riverside County (3). CSLB lists license 1016742 (ELITE HOME REMODELING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
55
Last 24 months
1
Total capacity
321.7 kW DC
Median system size
4.8 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 55 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Sep 18, 2024
Ownership types recorded
none recorded
First install
Aug 19, 2022
Latest install
Sep 18, 2024
Counties
10
Utilities
SCE 49, PGE 6
CSLB license
1016742

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022190
2023330
202430
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 55 interconnected installs (7.3% of the 55 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Sep 18, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05192.7%0 (0.0%)
Net Billing Tariff47.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ELITE HOME REMODELING INC’s installs. No residential system in the file lists a third-party owner name that matches ELITE HOME REMODELING INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of ELITE HOME REMODELING INC’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Znshine.

In the last 24 months, 1 of ELITE HOME REMODELING INC’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine124
Inverter makerEnphase126

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 52 of 55 installs, inverters on 55. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1016742ELITE HOME REMODELING INC (Corporation)CLEARB General Building ContractorJul 29, 2016Jul 31, 202855

License numbers are the ones the utilities recorded on the interconnection applications (55 of 55 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1016742. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles34
Orange5
Riverside3
San Bernardino3
Ventura3
Alameda2
Contra Costa2
Kern1
Solano1
Sonoma1

Top cities

CityInstalls
Compton3
Pomona3
Whittier3
Covina2
Lancaster2
Moreno Valley2
Ontario2
Palmdale2
Santa Ana2
Santa Clarita2
Acton1
Altadena1
Artesia1
Berkeley1
Brentwood1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELITE HOME REMODELING INC55

Common questions

Where does ELITE HOME REMODELING INC install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (34 installs), followed by Orange County (5).

How often does ELITE HOME REMODELING INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many ELITE HOME REMODELING INC installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 55 interconnected installs (7.3% of the 55 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.